Download Print this page

Maintenance - Sealey ECS400 Instructions Manual

Electronic charger starter 12/24v 400amp max

Advertisement

7.3.1.
If you want to interrupt the battery charging cycle, simply press the START/SToP key; the corresponding led will switch off to
show that the work cycle has ended. At this stage, it is recommended to disconnect the output leads from the battery terminals/earthng
point.
7.4.
interruption of the charging cycle in the case of a power supply cut.
7.4.1.
In the case of a mains power supply cut, the charger saves the work cycle that it was performing in order to restore it automatically
as soon as the power supply is restored.
7.4.2.
This function is fundamental if the battery charger is used to charge batteries without the operator supervising the cycle; for
example, during very long charging cycles (charge maintenance) or when charging overnight (charges for vehicles that need to be
charged daily).
7.5.
End of charging.
7.5.1.
once the battery is charged, unplug the power supply lead of the charger from the mains supply.
7.5.2.
disconnect the output lead with the black clamp from the negative terminal (-) of the battery or from the vehicle's earthing point.
7.5.3.
disconnect the output lead with the red clamp from the positive terminal (+) of the battery. Store clamps properly on the charger.
7.6.
starting a Vehicle.
7.6.1.
Connect the charger to the vehicle as in section 7.1.1. to 7.1.4. above, and connect the charger to the mains supply as in 7.2.1.
above.
7.6.2.
Select Start and also the correct battery type and battery capacity using the selection buttons on the control panel.
7.6.3.
Press the Start button and the Start LED will flash for a while (analysis), and then will remain on (fast charging). Engine starting can
now be attempted.
7.6.4.
Attempt to start the engine - the scrolling message START appears on the display - if the engine doesn't start within 5 seconds,
stop cranking the engine and wait for 120 seconds before attempting again. A maximum of 5 cycles of starting/resting is oK, before
a longer rest period is needed before attempting again. This is important as the charger needs a cooling down period.
7.6.5.
When the engine starts, switch off the charger and remove the clamps from the battery in the order as in section 7.5. above.

8. maintEnancE

8.1.
When the battery charger is not being used, it must be stored in a dry place to protect it against humidity.
use a soft cloth to clean its outer casing.
note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without
prior notice.
important: no liability is accepted for incorrect use of this product.
Warranty: guarantee is 12 months from purchase date, proof of which is required for any claim.
EnVironmEnt protEction
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
WEEE rEgUlations
dispose of this product at the end of its working life in compliance with the eu directive on Waste electrical and electronic equipment
(Weee). When the product is no longer required, it must be disposed of in an environmentally protective way. Contact your local solid
waste authority for recycling information.
sealey group, Kempson Way, suffolk Business park, Bury st Edmunds, suffolk. ip32 7ar
01284 757500
© Jack Sealey limited
01284 703534
sales@sealey.co.uk
Original Language Version
www.sealey.co.uk
eCS400 | Issue 2 (H13F) 20/04/18

Advertisement

loading