Download Print this page

Sealey GSS1508G Instructions Manual page 13

Galvanized steel shed green 1.5 x 0.8 x 1.9m
Hide thumbs Also See for GSS1508G:

Advertisement

If required, the door can be assembled on the opposite side. Align the door with the edge and drill new holes. Remove the pin from
the hinge and reverse it before assembling the door. Fill the old pre-drilled holes with rivets if required. Perform the same procedure
for the pad lock.
Parts support is available for this product. To obtain a parts listing and/or diagram, please log on to www.sealey.co.uk,
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be
sorted, taken to a recycling centre and disposed of in a manner which is compatible with the environment.
When the product becomes completely unserviceable and requires disposal, drain off any fluids (if applicable)
into approved containers and dispose of the product and the fluids according to local regulations.
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
IMPORTANT: No liability is accepted for incorrect use of this product.
WARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
INFORMATION: For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.
© Jack Sealey Limited
email sales@sealey.co.uk or telephone 01284 757500.
Environmental Protection
Sole UK Distributor, Sealey Group,
Kempson Way, Suffolk Business Park,
Bury St. Edmunds, Suffolk,
IP32 7AR
Original Language Version
www.sealey.co.uk
01284 757500
sales@sealey.co.uk
01284 703534
GSS1508G
Issue: 1 - 28/08/14

Advertisement

loading