Installing The Turbocharger - ABB A145-M56 Operation Manual

Hide thumbs Also See for A145-M56:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
2
Removing and Installing
2.3

Installing the turbocharger

2.3.1
Inserting gaskets
Inserting the gaskets
Gaskets that are forgotten, damaged or improperly inserted will lead to oil
leaks.
CAUTION
Always use new gaskets and insert them carefully into the slot.
The oil is supplied (02) and drained (03) through the bracket (01).
The necessary sealing is provided by O-rings. The O-rings are not included in the ABB Turbo
Systems scope of delivery.
Figure 9: Inserting gaskets into the bracket
01 Bracket
02 Oil supply
03 Oil drain
Pin (06) as installation safety device
Turbochargers can have an oil inlet either on their right or left side; the oil inlet position can be
different for the turbocharger fitted on the left and on the right engine bank.
A pin can be installed in every support as an installation safety device to prevent inadvertent
incorrect fitting. This pin fits into the respective slot on the foot of the bearing casing. Instruc-
tions of the enginebuilder must be observed.
© Copyright 2017 ABB. All rights reserved.
04 Slot for O-ring
05 O-rings
06 Pin (optional)
HZTL4031_EN
Page 16 / 121
Revision E
January 2017

Advertisement

Table of Contents
loading

Table of Contents