Table 40 Tightening Torque (51007) - ABB A145-M56 Operation Manual

Hide thumbs Also See for A145-M56:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
8
Dismantling and fitting
Page 95 / 121
Installing the cartridge group
Figure 47: Installing the cartridge group
Part number
A130
A135
A140
A145
51007
M8
M10
M12
M12
25 Nm
45 Nm
75 Nm
75 Nm
Table 40: Tightening torque (51007)
1. Coat the threads of the studs (51006) with high-temperature grease.
2. Align the casing position of the cartridge group with the marking.
3. Lower the cartridge group into the turbine casing.
4. Remove ring nuts and screws.
5. Install the fastening strips (51002) with Verbus Ripp®discs (51003) and hexagon
nuts (51007).
6. Tighten the hexagon nuts (51007).
© Copyright 2017 ABB. All rights reserved.
HZTL4031_EN
Revision E
January 2017

Advertisement

Table of Contents
loading

Table of Contents