Warranty Information for your Grace Machine Quilting Frame The Machine Quilting Frame has a One-Year limited warranty on all parts. The Grace Company will repair or replace, at its discretion, any part with manufacturing defects. This warranty does not cover parts damaged through misuse, improper storage, improper assembly, loss, natural events, and willful destruction.
Part List Box 1 Rail (4) Frame End Left (1) [EL] Rail Coupler(2) Frame End Right (1) [ER] Table Angle Support(4) Short Track Support(4) [STS] Table Brace(4) Long Track Support (2) [LTS] Table Support (4) [TS] Box 2 Carriage (1) Frame Leg Rail Holder Bracket Left (2) Rail Holder Bracket Right (2)
Page 4
Box 2 - Continued Sewing Machine Carriage Channel Bungee Clamp Channel Lock with Lock (1) Assembly (4) Spacer (1) Ratchet Cap (2) C-Clamp FabriFast Non-Ratchet Wheel (2) Tool (1) Fabrifast Tubing (2) Short Track (2) Long Track (2) Ratchet Wheel Hardware M5 x 10mm M6 x 16mm...
Step 1: Leg Assembly Parts Needed: -Frame Leg (3) -Table Support (4) -Table Angle Support (4) -M6 x 16mm SBHCS (8) -M6 x 10mm Connector Bolt (8) 1-1: Set up the Frame Leg on the left side. Place Table Support on top of the curved tube of the leg.
1-7: Place a Table Angle Support at a 45 degree angle on the front top corners and back top corners of the frame on the outside. Line up the holes on the angle support with one hole on the front side of the leg tube, Table Angle Support and one hole on the table support.
Step 3: Frame End Left & Right Fig.3 Assembly Parts Needed: -Frame End Left (1) -Frame End Right (1) -M6 x 10mm Connector Bolt (8) 3-1: Put (1) Frame End Right to the right side of the Right Leg, align the 2 groups of screw holes with the screw holes on the leg and (4) M6 x 10mm screw in (4) M6 x 10mm Connector Bolt.
4-5: Repeat through Steps 4-1 to 4-3 to assemble the other side of the the track on crib size frame as well, see Fig. 4-3. 4-6: Tighten the track along the front of the frame, making sure the track supports are even with the front edge of the frame. Note: Leave the rear track loose at this time.
Step 6: Rails Assembly Rail Coupler M6 x 12mm Parts Needed: Set Screw -Rail (4) Fig.6 -Rail Coupler (2) -M5 x 10mm SBHCS (4) Rail Non-Ratchet Wheel (2) -Ratchet Wheel M5 x 10mm M5 x 10mm Ratchet Cap (2) SBHCS SBHCS Non-Ratchet 6-1: Put a Rail Coupler into a Rail, aligning...
Step 7: Placing the Carriage Parts Needed: -Carriage (1) -Frame body Assembly (1) - Carriage Channel Lock (1) 7-1: Remove the right rear M6 x 20mm SBHCS from the Carriage and install the Carriage Channel Lock as shown, Carriage Channel Lock M6 x 20mm SBHCS see Fig.7.
Step 8: Channel Lock Installation Parts Needed: -Top Plate Assembly (1) Optional Accessory -Frame body Assembly (1) -Sewing Machine Channel Lock with Spacer (1) - Carriage Channel Lock (1) 8-1a: Remove the right rear M6 x 16mm SBHCS from the Sewing Machine and install the Sewing Machine Channel Lock using the M6 x 20mm SBHCS Sewing Machine as shown, see Fig.8.
Page 12
Note: It may be neccessary to adjust the Rail Bracket Holders up to fit the Sewing Machine. Loosen the Wing Knob on each of the Rear Rail Bracket Holders and move the Rail Bracket Holders up. See Fig 9-1 9-1: Place your sewing machine onto the Top Plate of the Carriage, and center it, from side to side and from front to back.
Step 10: Adjusting the Rail Holder Brackets 10-1: Position the Sewing Machine in the center of the Carriage. 10-2: Loosen the Wing Knobs on each of the Rear Rail Holder Brackets. 10-3: Adjust the Rear Rail Holder Brackets until the Take-Up Rail is centered in the throat of the Sewing Machine.
Quilting Frame Fabric Installation With the Grace Company’s, specially designed Fabri-Fast rails, installing your fabric is easier on this Frame than on any other frame. Each rail has a Fabri-Fast slot and accompanying tubing. These work together to make your fabric installation much easier and faster than using tape, tacks, or Velcro®.
This will be the line to which you attach your fabric layer. 7: Center your cloth leader lengthwise along the rail. Using Grace’s Fabri-FastTM System, take a piece of plastic tubing (cut to the appropriate length), and, holding your cloth leader to the slot (lining up the dashed line), press the tubing over the leader and into the slot.
Step 4: Attach quilt top to take up rail. Step 1-3: Roll your leader and backing onto the 2nd rail completely. Watch to make sure 1st rail (take up rail) the fabric stays lined up. Smooth out any 2nd rail wrinkles as you roll by brushing the fabric from the center out.
Step 3: Attaching the Bungee Clamps Bungee Clamp Step 3-1: Attach the Bungee Clamps to the Rail Holder Brackets by putting Bungee Button the cord through the holes. Attach the Bungee Clamps to the fabric and pull evenly and pull cord down to lock into place.
The following accessories are available for your new SR-2 Machine Quilting Frame. Each is designed to make your quilting projects easier and even more beautiful. They can all be purchased through your GraceFrame dealer, or directly from The Grace Company. www.graceframe.com...
Need help?
Do you have a question about the SR2+ and is the answer not in the manual?
Questions and answers