Container ground point
500
Grounding point
Note:
1. Install two ground points on the front wall and the rear wall of the container. The ground points are shown
in the preceding figure. Before grounding, remove the aluminum foil from the ground points. Use M12x30
stainless steel hexagon-head bolts to tighten the ground bolts to 60 N·m.
No.S003 Site Space and Pre-fab. Module Installation Pos
(Single-capacity Base Scenario)
Name
No.
Qty
Unit
Screw GB5783-2000_M12×30_S_ZNAL
2
PCS