FOR SAFE USE Before the installation, operation, and inspection for this product, read the “FOR SAFE USE” and the technical manuals carefully. Also read the other technical manuals, “Sewing Machine Head”, “Control Unit” and “Operation Panel” describing some instructions, which are not in this manual, and use the sewing machine properly.
This clamp is effective if the material to be stitched is heavy and the magnetic type clamp is too weak to hold the material, or if the material is soft and needs to be gently pressed. 2. Specifications : MP-G10-AO (pneumatic type clamp) Name : PLK-G1010 Applicable model: :...
Page 4
3. Configuration ★ The Fig. numbers in the drawing correspond to the part numbers given in the following explanations. 3.1 Clamp mechanism - 2 -...
4. Setup procedures CAUTION Alwa ys mak e sure that the powe r is OFF before sta rting se ttin g wo rk . 4.1 Installing the clamp drive mechanism (1) Remove the four screws on the Y axis movement race side fixing the clamp base (Fig.No.112) and the two screws on the axis support side, and remove the magnetic clamp mechanism mounted as a standard on the sewing machine.
Signal name Connection Solenoid Sewing machine head solenoid PCB valve White +24V CON13 (FU) - ② Work holder ouput 1 Sewing machine head solenoid PCB Black CON13 (FU) - ① ( O4 ) 4.4 Installing the system software When this sewing machine is already used, installation explained by this 4.4 clause is not necessary.
Page 10
(4) Enter a password Please ask the dealer about a password. (5) Press the inside of the frame under the (A display in the frame is OF1 in a standard setting. If it is the other display, change to OF1.) * Refer to the clause Output confirmation (Custom output) [of 2.Explanation of input/output setting mode of [14]Input/output setting mode] of the technical manual ”Operation Panel”...
5. Operation 5.1 Confirming operation (1) Turn the sewing machine power switch ON. (2) Confirm that the work clamp lower when the foot switch (2-pedal) [Black] side is turned ON, and rise when the switch is turned ON again. (3) Lower the work clamp, and press on the operation panel.