Support-Mounted Installation - Huawei ACBox2000-21-D-A User Manual

Table of Contents

Advertisement

ACBox2000-21-D-A
User Manual (Pan-Europe Edition)

4.6 Support-Mounted Installation

Procedure
Step 1 Locate the positions for drilling holes based on the ACBox2000 installation dimensions, level
the hole positions using a level, and mark holes using a marker.
Figure 4-7 Marking holes
Step 2 Drill holes using a hammer drill.
Figure 4-8 Drilling holes
Step 3 Insert the delivered bolt assemblies (spring washers, flat washers, and M12x40 bolts) into the
holes, and secure them using stainless steel nuts and flat washers.
Issue 01 (2016-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installation
18

Advertisement

Table of Contents
loading

Table of Contents