Terminal Assignments - ABB Symphony Harmony Series Instruction

Hydraulic servo termination unit
Hide thumbs Also See for Symphony Harmony Series:
Table of Contents

Advertisement

Terminal Block Wiring
+
1
L O W E R
2
3
+
4
R A IS E
5
6
+
7
T _B IA S
8
9
+
1 0
H _ M A N
1 1
1 2
Figure 2-4. Terminal Assignments
Installation Complete
WBPEEUI260047A0
1. Attach a 14 AWG wire from the 24 VDC power distribution
source to the E1 terminal on the termination unit.
2. Attach a 14 AWG wire from the I/O common to the E2
terminal of the termination unit.
Refer to Figure
nal polarity. Field wiring requirements will depend on the
application. Refer to the Site Planning Guidelines
for specific information on field wiring installation require-
ments (i.e., spacing, isolation, etc.). Connect the wiring from
the terminals to the output devices.
TB 1
13 +
LV D T1
14 –
S 1
15
4-20 m A
16 +
FD B K
LV D T1
17 –
S 2
18
U N S C A L E D
19 +
FD B K
LV D T1
20 –
P W R O U T
21
TE S T
M O D E O U T
22 +
LV D T1
23 –
AU X P W R IN
24
The termination unit is ready for operation when:
1. The fuse is installed.
2. The jumpers are installed.
3. The dipshunts are installed.
4. The termination unit is installed on the field termination
panel.
2-4
for terminal block assignments and termi-
Site Planning Guidelines instruction
Site Planning Guidelines
Site Planning Guidelines
TB 3
S E RVO 1
C 1
+
1
2
3
S E RVO 1
C 2
+
4
5
6
S E RVO 2
C 1
+
7
8
S E RVO 2
C 2
Installation Complete
TB 2
1 3
+
+
1
LV D T2
1 4
S 1
2
1 5
3
1 6
+
+
4
LV D T2
1 7
S 2
5
1 8
6
1 9
+
+
7
LV D T2
2 0
P W R O U T
8
2 1
9
2 2
+
+ 10
LV D T2
2 3
AU X P W R IN
– 11
2 4
12
T 0 33 7 6 A
2 - 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nths03

Table of Contents