Installing The Push Nut (Ce Only) - Toro Greenmaster Flex 1820 Operator's Manual

18in and 21in, 11- and 14-blade cutting unit
Hide thumbs Also See for Greenmaster Flex 1820:
Table of Contents

Advertisement

1. Center, grass-shield bolt
Installing the Weight Rod
1.
Enlarge the lower hole on the right side of the
cutting unit using a 9 mm (23/64 inch) drill bit
(Figure
5).
2.
Lubricate the O-ring on the weight rod.
3.
Insert the O-ring end of the weight rod into the
previously drilled hole.
4.
Secure the threaded end of the weight rod to the
frame using a flange-head bolt
Figure 4
2. Target plate
Figure 5
(Figure
6).
1. Flange-head bolt
g017294
Installing the Push Nut (CE
Only)
1.
Loosen the flange bolt securing the belt cover
and remove the belt cover.
2.
Slide the push nut onto the belt cover plug
(Figure
7).
g026123
1. Push nut
3.
Install the belt cover.
6
Figure 6
2. Weight rod
Figure 7
2. Belt-cover plug
g026124
g027722

Advertisement

Table of Contents
loading

Table of Contents