Huawei TP48200A-HX09A2 Installation Manual page 53

Hide thumbs Also See for TP48200A-HX09A2:
Table of Contents

Advertisement

TP48200A-HX09A2 & TBC300A-TCA2
Installation Guide
Figure 5-1 Installing ground cables for combined cabinets
(1) Ground bar in the power
cabinet
----End
Installing Ground Cables for Stacked Cabinets
Step 1 Route ground cables into the power cabinet through the package entry modules in the power
cabinet and battery cabinet.
Step 2 Secure ground cables to the ground bar in the power cabinet.
Step 3 Route an equipotential ground cable for cabinet stacking into the power cabinet and battery
cabinet through the cable hole at the top of the battery cabinet and the package entry module
at the bottom of the power cabinet.
Step 4 Connect one end of the equipotential ground cable to the ground bar in the power cabinet, and
the other end to the ground bar in the battery cabinet, as shown in
Issue 01 (2013-10-25)
(2) Site ground
bar
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing Ground Cables
(3) Ground bar in the battery
cabinet
Figure
5-2.
46

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tbc300a-tca2

Table of Contents