Figure 3-97: Module #7 To Module #8 Signal Cabling - Samsung 136S Installation Manual

Lib system for ups
Hide thumbs Also See for 136S:
Table of Contents

Advertisement

Confidential
Connect the signal cable "WIRE ASSY MODULE TO MODULE #1" from Module #7 "Left connector" to
8.
Module #8 "Right connector".
Connect the signal cable "WIRE ASSY MODULE TO MODULE #2" from Module #8 "Left Connector" to
9.
Module #9 "Right Connector."
English 8/2019. Rev 0.0

Figure 3-97: Module #7 to Module #8 Signal Cabling

Figure 3-98: Module #8 to Module #9 Signal Cabling
.
3
Installing the Product
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents