IDS1000-A Air-Cooled Container Data Center
V200R002
All-in-One Maintenance Guide
01
Date
2016-01-10
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei IDS1000-A

  • Page 1 IDS1000-A Air-Cooled Container Data Center V200R002 All-in-One Maintenance Guide Issue Date 2016-01-10 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document Purpose This document describes the operation methods and precautions for the IDS1000-A container data center (IDS1000 for short) in terms of the routine maintenance, emergency operations, alarm handling, and parts replacement. It provides you a quick grasp of the operation and maintenance (O&M) methods of the IDS1000.
  • Page 4 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide About This Document Symbol Description Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury.
  • Page 5: Table Of Contents

    2 Preparations............................ 3 2.1 Tools ..................................... 3 2.2 Obtaining Technical Documents ........................... 5 2.3 O&M Personnel Skill Requirements ..........................6 2.4 Contacting Huawei Technical Support ......................... 7 3 Maintenance ........................... 8 3.1 Routine Maintenance ..............................8 3.2 Monthly Maintenance ..............................10 3.2.1 Power Supply and Distribution System ........................
  • Page 6 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide Contents 4 Alarms and Faults ........................45 4.1 Alarm Handling Flowchart ............................45 4.2 Viewing and Collecting Alarm Information ........................ 46 4.3 Determining the Faulty Area and Alarm Severity ....................... 47 4.4 Locating and Rectifying Faults ........................... 48 4.5 Emergency Operation ..............................
  • Page 7 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide Contents 5.2.7.2 Replacing the Condensate Drainpipe of a Precision Air Conditioner ..............91 5.3 Replacing Monitoring System Components ....................... 93 5.3.1 Replacing a T/H Sensor ............................93 5.3.2 Replacing a Water Sensor (Point Type) ........................94 5.3.3 Replacing a Water Sensor (Rope Type) ........................
  • Page 8 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide Contents 5.5.9 Replacing a Fire Control Panel ..........................148 5.5.10 Replacing an Emergency Light ..........................150 6 Emergency Operations ......................151 6.1 Emergency Operations for Mains Failure ......................... 151 6.2 Emergency Operations for Circuit Breaker Tripping ....................152 6.3 Overload Emergency Operations ..........................
  • Page 9: M Precautions

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 1 O&M Precautions O&M Precautions Power Supply and Distribution System  Before replacing a component, ensure that the component and its battery are powered off.  When operating power distribution equipment, follow the local regulations and rules.
  • Page 10: Cooling System

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 1 O&M Precautions  Replace batteries only with the ones of the same or equivalent type. Improper battery replacement may cause an explosion. Cooling System  Assign only professional engineers to perform O&M for the cooling system.
  • Page 11: Preparations

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 2 Preparations Preparations 2.1 Tools Before the O&M, obtain tools and materials listed in Table 2-1. Table 2-1 Tools Tools Phillips screwdriver Flat-head screwdriver Adjustable wrench M4/M6/M8 (2–5 mm) Electrician's knife Needle-nose pliers...
  • Page 12 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 2 Preparations Tools Cable cutter Hex key Hand-held thermometer Multimeter Electroprobe Network cable tester Heat gun Utility knife Step ladder (2 m) Nylon cable tie Insulation tape ESD wrist strap ESD gloves...
  • Page 13: Obtaining Technical Documents

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 2 Preparations 2.2 Obtaining Technical Documents Table 2-2 lists the technical documents required for IDS1000 O&M. Table 2-2 Document list Technical Manual Function Obtaining Method (Remarks) Initial Configuration Guide Provides guidelines for...
  • Page 14: O&M Personnel Skill Requirements

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 2 Preparations Technical Manual Function Obtaining Method (Remarks) UPS2000-G-(6 kVA-20 kVA) Describes how to operate Downloaded from User Manual and maintain the UPS. http://e.huawei.com. UPS5000-E-(40 kVA-320 Describes how to operate Downloaded from kVA) User Manual and maintain the UPS.
  • Page 15: Contacting Huawei Technical Support

     Name and phone number of the contact person  Fault scenario and detailed fault information You can obtain technical support from Huawei over the network or telephone. For details, see Table 2-4. Table 2-4 Obtaining technical support from Huawei If...
  • Page 16: Maintenance

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Maintenance 3.1 Routine Maintenance Table 3-1 Routine maintenance checklist Catego Item Method Expected Troubleshooting Result Manage IDS1000 Choose Fault > No alarm is For details, see the ment alarms Current Alarms...
  • Page 17 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Catego Item Method Expected Troubleshooting Result If the camera is normal but no video image is displayed: 1. Connect the VCN500 cable again. 2. If the cable is correctly connected,...
  • Page 18: Monthly Maintenance

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance 3.2 Monthly Maintenance 3.2.1 Power Supply and Distribution System Table 3-2 Monthly maintenance checklist for the power supply and distribution system Item Method Expected Troubleshooting Result Check the If an indicator is off or dim, replace...
  • Page 19 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result View the The status If an alarm is present, refer to the monitoring panel icons on the UPS5000-E alarm reference to of the UPS5000-E. LCD indicate...
  • Page 20: Cooling System

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result  Check the battery The battery Identify the cause of an abnormal temperature. operating battery operating temperature. temperature is lower than 45° C.  ambient...
  • Page 21 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result Check the No foreign Remove foreign matter. evaporator. matter exists on the evaporator surface. Check the The refrigerant Repair the refrigerant pipe and wrap refrigerant pipe.
  • Page 22 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result  Observe the liquid The sight glass If the sight glass completely loop sight glass. is green. turns yellow, there is too much water in the pipe. To solve the...
  • Page 23 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result Check electric The electric Secure the electric heaters and heaters. heaters and switches. switches are secure. The electric Replace the electric heater by heater surface...
  • Page 24: Monitoring System

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance 3.2.3 Monitoring System Table 3-4 Monthly maintenance checklist for the monitoring system Item Method Expected Troubleshooting Result Event and Choose System Normal system See the documents delivered with operation Event Log in the events are the RH2288 V2 server.
  • Page 25: Fire Extinguishing System (Standard)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance When you check the hydrogen sensor in the container, only a small amount of hydrogen needs to be released onto the sensor. During the entire process, flames and sparks are prohibited in or around the power supply and battery compartments.
  • Page 26: Fire Extinguishing System (Ce)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result Hand-held Check the fire The fire If the fire extinguisher is damaged, fire extinguisher. extinguisher is replace it. extinguisher intact. The fire If the fire extinguisher has expired, extinguisher is replace it.
  • Page 27: Other Systems

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting 1. Check and reconnect Emergency Remove the red The emergency power cables to the lights test button from lights are on. emergency lights. the emergency lights.
  • Page 28: Quarterly Maintenance

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance 3.3 Quarterly Maintenance 3.3.1 Power Supply and Distribution System Table 3-8 Quarterly maintenance checklist for the power supply and distribution system Item Method Expected Result Troubleshooting UPS5000-E Use a multimeter or...
  • Page 29 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting UPS2000 After you press any If the LCD does not turn Press the button on the panel, the on and has no backlight, button on the panel replace the LCD.
  • Page 30 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting Battery pack When the AC supply is None charging and disconnected, the battery discharging. packs automatically begin to carry the load. Ensure that both the...
  • Page 31: Cooling System

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting  Observe the LCD of The ATS controller LCD If the LCD displays controller the ATS controller. displays information no information or the clearly. information...
  • Page 32 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting Check the There is no scale. Clean the condensate water pan. condensate water pan. Check the Switch the If the drainage is abnormal: humidifier humidifier manual ...
  • Page 33 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting  Replace the humidifier Measure the phase Each phase cylinder by following currents when the current is no less instructions in the air humidifier is than 1.2 A (1/3 of...
  • Page 34: Monitoring System

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance 3.3.3 Monitoring System Table 3-10 Quarterly maintenance checklist for the monitoring system Item Method Expected Troubleshooting Result T/H sensor Use a hand-held The values If the differences exceed the thermometer to...
  • Page 35: Fire Extinguishing System (Standard)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result  Check The indicators If the indicators are off, the LK1–LK4 are steady red. magnetic lock may be faulty. indicators when Replace the faulty magnetic lock by...
  • Page 36: Fire Extinguishing System (Ce)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance  Before conducting quarterly maintenance for the fire extinguishing system, notify the related administrative departments that the fire extinguishing system will stop work during the maintenance. In addition, disable the logical control function of the area or system to prevent false alarms.
  • Page 37 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance  Before conducting quarterly maintenance for the fire extinguishing system, notify the related administrative departments that the fire extinguishing system will stop work during the maintenance. In addition, disable the logical control function of the area or system to prevent false alarms.
  • Page 38: Other Systems

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance 3.3.6 Other Systems Table 3-13 Quarterly maintenance checklist for other systems Item Method Expected Troubleshooting Result 1. Clean the container using a Containers Check the The container long-handled soft brush and container.
  • Page 39: Cooling System

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance 3.4.2 Cooling System Table 3-15 Semi-annual maintenance checklist for the cooling system Item Method Expected Troubleshooting Result Pipes Check the safety Nuts on safety If a nut is loose, tighten it using a clamps.
  • Page 40 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result If the PWR Replace by following instructions indicator is 5.3.10 Replacing a LAN Switch. steady orange, the PoE is abnormal when the LAN switch is configured with one PSU.
  • Page 41 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result  Access (Optional) Check The indicator If the indicator status is incorrect, control the magnetic lock turns red replace by following instructions system indicator. when the 5.3.13.3 Replacing a Magnetic...
  • Page 42 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result Read your The container If the container door cannot be fingerprint to open door can be opened, replace by following opened. the door after you instructions in 5.3.13.6 Replacing...
  • Page 43 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result Calibrate the Calibrate the Replace expired or faulty sensitivity of the sensor by hydrogen detectors by following hydrogen detector. choosing SEN instructions in documents delivered with the hydrogen (sensitivity 1.
  • Page 44: Fire Extinguishing System (Standard)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Troubleshooting Result Calibrate the Calibrate the Replace expired or faulty correction value of sensor by hydrogen detectors by following the hydrogen choosing SEN instructions in documents detector.
  • Page 45 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance  Semi-annual maintenance of the fire extinguishing system involves system commissioning. Before the maintenance, inform the related administrative departments that the fire extinguishing system will be maintained and stop working. In addition, disable the logical control function of the area or system to prevent false alarms.
  • Page 46: Fire Extinguishing System (Ce)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting Fire alarm Simulate a scenario Flashes and alarms are If the fire alarm horn strobe horn strobe to trigger the generated loud and does not generate sound or clear.
  • Page 47 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance  Semi-annual maintenance of the fire extinguishing system involves system commissioning. Before the maintenance, inform the related administrative departments that the fire extinguishing system will be maintained and stop working. In addition, disable the logical control function of the area or system to prevent false alarms.
  • Page 48: Other Systems

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting sampling pipe. The VESDA sends See documents delivered with an alarm signal to the the VESDA. host. Check the VESDA All indicators are See documents delivered with operation panel.
  • Page 49: Annual Maintenance

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Item Method Expected Result Troubleshooting containe connected Cable trays, screws, and Repaint corroded cable trays, without damage nuts are free from rust or or replace damaged and or misshapen. corrosion.
  • Page 50 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Categ Item Method Expected Troubleshooting Result Circuit Manual switch The circuit If a circuit breaker does not breakers off and on the breakers operate smoothly, repair or circuit breakers operate replace the circuit breaker.
  • Page 51 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Categ Item Method Expected Troubleshooting Result  UPS5000 Check whether Equalized If the charging voltage of a -E battery the equalized charging battery exceeds the charging voltage: specifications requirement, voltage and 2.35 V/cell...
  • Page 52 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 3 Maintenance Categ Item Method Expected Troubleshooting Result   Other Groundin Check Ground If the container ground points system whether the points on are damaged, repair them and containers take anti-corrosion measures.
  • Page 53: Alarms And Faults

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Alarms and Faults 4.1 Alarm Handling Flowchart Figure 4-1 shows the alarm handling flowchart. Issue 01 (2016-01-10) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 54: Viewing And Collecting Alarm Information

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Figure 4-1 Alarm handling flowchart 4.2 Viewing and Collecting Alarm Information Prerequisites An alarm is generated. Alarm information helps to rapidly locate and rectify faults. Obtaining Tools and Materials ...
  • Page 55: Determining The Faulty Area And Alarm Severity

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Procedure Step 1 Enter your user name and password to log in to the NetEco.  If the password was changed when the management system was commissioned, enter the new password.
  • Page 56: Locating And Rectifying Faults

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Critical alarms include the following:  Alarms that cause system shutdown  Alarms that result in equipment damage or affect equipment usage  Alarms that may result in serious results (such as fire or communication interruption) 4.4 Locating and Rectifying Faults...
  • Page 57 Alarm reference in this document  Alarm reference obtained from Huawei technical support It is recommended that the alarm handling report consists of information about the alarm occurrence time, location, symptom, fault locating process, alarm handling process, and alarm prevention solutions.
  • Page 58: Emergency Operation

     Only trained and qualified personnel are allowed to perform emergency operations.  For more emergency operations for the IDS1000, contact Huawei technical support. IDS1000 Common Critical Alarms and Faults Table 4-2 describes the common critical alarms and faults in the IDS1000.
  • Page 59 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Alarm or Find Through Possible Cause Possible Emergency Fault Impact Operation Battery Maintenance or The battery is The battery 6.4 Emergency Electrolyte equipment damaged. cannot work Operations for...
  • Page 60: Vesda Alarms

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Alarm or Find Through Possible Cause Possible Emergency Fault Impact Operation Composite Fire System and A fire occurs in A fire occurs. 6.12 Alarm equipment the data center.
  • Page 61: Fire Alarms (Ce)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults A fire can seriously affect the stable running of the system and equipment safety. Therefore, any fire alarm must be immediately handled. 4.8 Fire Alarms (CE) Fault Alarm...
  • Page 62 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause An air Replace the faulty conditioner component by component is following instructions faulty. in the air conditioner user manual. The power load...
  • Page 63: Humidity Alarms

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults  Air-cooled precision air conditioners include 20 kW and 35 kW models. When verifying parameters, ensure that the initial configuration table of the correct model is obtained. ...
  • Page 64: Door Status Alarm

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause The onsite humidity Troubleshoot by is too low. humidification following instructions function of air in the air conditioner conditioners is user manual.
  • Page 65: Water Intrusion Alarm

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause The access card The access card Prepare a new access cannot be read. is damaged. card and assign the access permission.
  • Page 66: Hydrogen Alarm

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause The thermal Replace by following insulation layer instructions in 5.2.6 is damaged. Replacing a Thermal Insulation Layer. The water sensor is...
  • Page 67: Mains Outage

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause inspection, but the The exhaust Clear the foreign matter management system vent is blocked. or replace by following displays a hydrogen instructions in 5.2.5...
  • Page 68: Spd Alarm

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause ation be performed. connected. Powered on the power failure distribution equipment where the MDU is installed again. The device is Replace by following faulty.
  • Page 69: Pdu8000 Mdu Alarms

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause The SPD circuit A false alarm is Switch on the SPD breaker is off. generated circuit breaker. (normally closed contact).
  • Page 70: Ats Alarms

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause Major The indicators of Cables are not Check whether the the monitoring properly auxiliary power input connected. board do not light...
  • Page 71: Ups5000-E Alarms

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults 4.20 UPS5000-E Alarms Fault Alarm Symptom Possible Troubleshooting Category Severity Cause UPS5000- Major The rectifier cannot The mains Check whether the E alarms work, and the bus voltage exceeds...
  • Page 72: Ups2000-G Alarms

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults 4.21 UPS2000-G Alarms Fault Alarm Symptom Possible Troubleshooting Category Severity Cause UPS2000- Major The mains switch is The input Check the UPS input G alarms ON. The LCD does...
  • Page 73: Kw Air-Cooled Precision Air Conditioner Alarms

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause is insufficient, and loads will be Connect the UPS input the UPS is shutting powered off. to the backup AC down.
  • Page 74 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause Major The compressor The refrigerant Clean up foreign matter exhaust temperature loop or from the refrigerant is too high. loop.
  • Page 75 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause Major The heating The electric Check the temperature function does not heater switch and replace it if work. it is faulty.
  • Page 76 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause 1. Check the alarms Water level displayed. floats are faulty. 2. Check cable connections for the high and low floats.
  • Page 77 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause 1. Start the humidifier The humidifier and check its circuit breaker current. The trips humidifier current automatically. should not exceed 4 A in normal operation.
  • Page 78: Kw Air-Cooled Precision Air Conditioner Alarms

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults 4.23 20 kW Air-cooled Precision Air Conditioner Alarms Fault Alarm Symptom Possible Troubleshooting Category Severity Cause 20 kW Major The compressor The device Check whether an does not work.
  • Page 79 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause Major The compressor The sheet metal Remove the sheet metal generates a loud for securing the and check whether the noise.
  • Page 80 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause Power supply Check the power supply to the indoor to the indoor fan. fan is Remove the terminals abnormal. of the fan, and check...
  • Page 81 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 4 Alarms and Faults Fault Alarm Symptom Possible Troubleshooting Category Severity Cause A float switch Check the float cables, is faulty. and check whether the float is damaged or not flexible. If the float is...
  • Page 82: Parts Replacement

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Parts Replacement 5.1 Replacing Power Supply and Distribution System Components 5.1.1 Replacing a PD510 Prerequisites  A PD510 electricity meter needs to be replaced.  A spare PD510 electricity meter of the same model is available and functional.
  • Page 83: Replacing The Mdu

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Procedure Step 1 (Optional) Remove the screws on the left of the PD510 electricity meter panel by using a Phillips screwdriver and open the panel. Step 2 Switch off the upstream circuit breaker of the PD510 electricity meter.
  • Page 84 Step 6 Connect the CAN and RS485_1 communications cable to the MDU. After the MDU is replaced, you need to load the configurations. If the configuration file cannot be exported from the faulty MDU, send the model bar code of the faulty MDU to Huawei technical support to obtain help.
  • Page 85: Replacing An Spd Module In The Power Distribution Cabinet

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement 5.1.3 Replacing an SPD Module in the Power Distribution Cabinet Prerequisites Do not replace a surge protection device (SPD) module during a thunderstorm.  An SPD module is faulty.
  • Page 86: Replacing A Ups5000-E Battery

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-2 Detecting the voltages Step 4 Hold down the faulty SPD module and pull it out, as shown in Figure 5-3. Figure 5-3 Replacing an SPD module ...
  • Page 87: Replacing A Monitoring Rpdu

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Impact on the System None Preparations Tools: pallet truck, wrench, protective gloves Materials: insulation tape, UPS5000-E battery, copper bar or cable Documents required: documents delivered with UPS5000-E battery, power supply and...
  • Page 88: Replacing An Rpdu

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Preparations Tools: Phillips screwdriver, protective gloves Material: spare monitoring rPDU Documents: none Skill requirement: electrician's work permit Procedure Step 1 Shut down devices powered by the monitoring rPDU, and unplug all power cables from the monitoring rPDU.
  • Page 89 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement  Check that the standby power supply to the rPDU is available. Impact on the System None Preparations Tools: protective gloves, Phillips screwdriver, step ladder Material: spare rPDU Documents required: none...
  • Page 90: Replacing Cooling System Components

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-6 Installing screws a the upper and lower sides of the rPDU Step 9 Connect the rPDU power cable on the top of the cabinet. Step 10 Switch on the circuit breaker for the rPDU in the PDC and check that the new rPDU is working properly.
  • Page 91 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Preparations Tool: flat-head screwdriver, step ladder (2 m) Material: spare remote T/H sensor Documents required: initial configuration parameters for cooling devices Skill requirement: cooling engineer For the table, see the initial configuration guide.
  • Page 92: Replacing Air Filters For A 20 Kw Air-Cooled Precision Air Conditioner

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement 5.2.2 Replacing Air Filters for a 20 kW Air-cooled Precision Air Conditioner Prerequisites  The air conditioner air filters need to be replaced.  Air filters of the same model are available and functional.
  • Page 93: Replacing Air Filters For A 35 Kw Air-Cooled Precision Air Conditioner

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-8 Removing the air filter Step 4 Correctly install the air filter based on the air flow direction indicated on the frame. Step 5 Reinstall the rear door.
  • Page 94 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Preparations Tool: protective gloves Material: spare air filters Documents required: none Skill requirement: cooling engineer Procedure Step 1 Open the rear door, and rotate the fixing cards on the two sides of the gauze, as shown by 1 in Figure 5-9.
  • Page 95: Replacing Parts Of An Air-Cooled Precision Air Conditioner

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Install air filters as instructed by the labels to avoid reverse installation. Step 5 Choose Maint > Performance Maint on the home screen and clear the air filter running time.
  • Page 96: Replacing A Ventilation Vent Air Filter

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Item Table 5-2 Parts that can be replaced for a 35 kW precision air conditioner Item Air filter Indoor fan Compressor Compressor driver Condensate pump Humidifier cylinder Electric heater 5.2.5 Replacing a Ventilation Vent Air Filter...
  • Page 97: Replacing A Thermal Insulation Layer

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-10 Removing an air filter Step 2 Clear foreign matter inside the ventilation vent using the brush. Step 3 Install the spare air filter. ----End Follow-up Procedure Dispose of the removed air filter that is confirmed faulty.
  • Page 98: Replacing Pipes

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement  If the condition allows, close the valves at both ends of the device for which the pipe thermal insulation foam needs to be replaced, and open the valves after the replacement is completed.
  • Page 99: Replacing The Condensate Drainpipe Of A Precision Air Conditioner

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Impact on the System None Preparations Tools: hex key, long-sleeved silicone gloves, vessel, adjustable wrench Materials: dry rag, sucker, thermal insulation foam, spare humidifier water refill pipe Documents required: container layout diagram Skill requirement: cooling engineer For the diagram, see the quick installation guide.
  • Page 100 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Impact on the System None Preparations Tools: adjustable wrench, utility knife, flat-head screwdriver, protective gloves Materials: dry rag, sucker, rubber plug, thermal insulation foam, spare condensate drainpipe Documents required: container layout diagram Skill requirement: cooling engineer For the diagram, see the quick installation guide.
  • Page 101: Replacing Monitoring System Components

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement 5.3 Replacing Monitoring System Components 5.3.1 Replacing a T/H Sensor Prerequisites  A T/H sensor needs to be replaced.  A spare T/H sensor of the same model is available and functional.
  • Page 102: Replacing A Water Sensor (Point Type)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Step 4 Check that the new T/H sensor is working properly. If the T/H sensor displays the temperature and humidity properly after power-on, the T/H sensor is working properly.
  • Page 103: Replacing A Water Sensor (Rope Type)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-14 Removing a point-type water sensor Step 3 Install a new water sensor and tighten the screws. Step 4 Connect cables to the water sensor. Step 5 Check that the new water sensor is working properly.
  • Page 104 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement For the diagram and table, see the initial configuration guide. Procedure Step 1 Locate the water sensor to be replaced based on the alarm information on the monitoring software terminal.
  • Page 105: Replacing A Door Status Sensor

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Follow-up Procedure Dispose of the removed water sensor that is confirmed faulty. 5.3.4 Replacing a Door Status Sensor Prerequisites  A door status sensor needs to be replaced. ...
  • Page 106: Replacing A Gsm Modem

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-17 Replacing a door status sensor Step 3 Install a new door status sensor, and reconnect the cables. Step 4 Check that the new door status sensor is working properly.
  • Page 107 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement For the diagram and table, see the initial configuration guide. Procedure Step 1 Shut down the GSM modem, and unplug the power cable. Step 2 Remove the GSM modem serial cable from the serial port of the RH2288 V2 server.
  • Page 108: Replacing A Hydrogen Collector

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-19 Installing the GSM modem antenna Step 8 Connect the power cable and turn on the GSM modem. If the GSM modem indicator is steady on, the GSM modem is turned on but not registered in the network.
  • Page 109 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Documents required: documents delivered with the spare hydrogen collector, power supply and distribution system diagram, monitoring device layout diagram Skill requirement: weak-current engineer For the diagram and table, see the initial configuration guide.
  • Page 110: Replacing A Hydrogen Exhaust Fan

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Pay attention to the negative and positive polarities of the power supply. If the polarities are connected incorrectly, the device may be burned. Step 6 Configure the new hydrogen collector based on the DIP switch settings for the removed hydrogen collector.
  • Page 111: Replacing A Camera

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Step 3 Bind the reserved segment of the power cable of the hydrogen exhaust fan to the main line using insulation tape to avoid dangers. Step 4 Remove the screws from the faulty hydrogen exhaust fan using a Phillips screwdriver, as...
  • Page 112: Replacing A Vcn500

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Skill requirement: weak-current engineer For the table, see the initial configuration guide. Procedure Step 1 Remove screws securing the camera cover using a dedicated hex key. Step 2 Use a Phillips screwdriver to remove the screws that fasten the camera to its base.
  • Page 113 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Procedure Step 1 Make a note of the cable connection and ports of the VCN500 to be replaced using the marker. Step 2 Shut down the VCN500, and disconnect the power plug.
  • Page 114: Replacing A Lan Switch

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Step 5 Reconnect the cables and the power plug of the VCN500. Step 6 Check whether the new VCN500 is working properly.  If the VCN500 power indicator is steady green, the VCN500 is working properly.
  • Page 115: Replacing The Ecc500 Collector

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-25 Installing a LAN switch Step 6 Reconnect all cables. Step 7 Connect the power plug of the LAN switch. Step 8 Check that the new LAN switch is working properly.
  • Page 116 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Documents required: collector port layout diagram, documents delivered with the ECC500 collector, initial configuration parameters for the management system Skill requirement: weak-current engineer For the diagram and table, see the initial configuration guide.
  • Page 117: Replacing An Rh2288 V2 Server

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Follow-up Procedure Dispose of the removed ECC500 collector that is confirmed faulty. 5.3.12 Replacing an RH2288 V2 Server Prerequisites  An RH2288 V2 server needs to be replaced. ...
  • Page 118: Replacing Access Control Components

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-27 Installing an RH2288 V2 server Step 5 Reconnect the cables and the power plug. Step 6 Press the power switch on the front panel of the RH2288 V2 server to power on the server, and check that the RH2288 V2 server is working properly.
  • Page 119 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Document required: initial configuration parameters for the management system Skill requirement: weak-current engineer Procedure Step 1 Remove the baffle plate for the access card reader using a Phillips screwdriver as shown in Figure 5-28.
  • Page 120: Replacing An Exit Button

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Step 3 Remove the terminal block of the faulty access card reader, and take out the access card reader. Step 4 Connect a new access card reader to the terminal block.
  • Page 121: Replacing A Magnetic Lock

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-30 Removing an exit button Step 2 Install a new exit button and reconnect cables. Step 3 Check whether the new exit button is working properly. If the container door can be opened using the exit button, and the door opening event is recorded, the new exit button is working properly.
  • Page 122 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Preparations Tools: Phillips screwdriver, hex key, step ladder (2 m) Material: spare magnetic lock Documents required: none Skill requirement: weak-current engineer Procedure Step 1 Use a Phillips screwdriver to loosen screws from the baffle plate of the magnetic lock and...
  • Page 123: Replacing The Electronic Lock

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement If the magnetic lock indicator is green when the container door is closed and red when the door is open, the magnetic lock is working properly. ----End Follow-up Procedure Dispose of the removed magnetic lock that is confirmed faulty.
  • Page 124: Replacing An Emergency Door Release Button

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Step 2 Remove the terminals connected to the electronic lock. Step 3 Remove the screws under the electronic lock using a Phillips screwdriver, and remove the faulty electronic lock, as shown in Figure 5-33.
  • Page 125 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Skill requirement: weak-current engineer Procedure Step 1 Remove the emergency door release button. Remove screws securing the emergency door release button, as shown by 1 in Figure 5-34. Remove the glass panel of the emergency door release button, as shown by 2 and 3 in Figure 5-34.
  • Page 126: Replacing A Fingerprint Scanner

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Remove the cover of the emergency door release button using a screwdriver, press the button, and rotate the door handle clockwise to open the container door. If the door can be opened, the emergency door release button is working properly.
  • Page 127: Replacing An Access Controller

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-36 Replacing a fingerprint scanner Step 3 Remove the base plate of the new fingerprint scanner, as shown by 4 and 5 in Figure 5-36. Step 4 Install the base plate of the new fingerprint scanner.
  • Page 128 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Procedure Step 1 Switch off the circuit breaker for the access controller. Step 2 Remove the access controller and mark cables, as shown in Figure 5-37. Figure 5-37 Removing an access controller Remove the terminals on the right side of the access controller.
  • Page 129: Replacing Fire Extinguishing System Components (Standard)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-38 Setting the access controller IP address Use a small-sized flat-head screwdriver to operate the DIP switch on the access controller to set the access controller IP address.
  • Page 130 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Impact on the System None Preparations Tools: protective gloves, step ladder Material: spare smoke detector Documents required: fire extinguishing device layout diagram Skill requirement: fire extinguishing engineer  Before replacing the smoke detector, inform the related administration department of the temporary downtime of the fire control system.
  • Page 131: Replacing A Heat Detector

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement The fire control panel generates a loop fault alarm, which is a normal response. Step 2 Disconnect the power supply to the fire control panel. Figure 5-40 shows terminals on the smoke detector base.
  • Page 132 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Preparations Tools: protective gloves, step ladder Material: spare heat detector Documents required: fire extinguishing device layout diagram Skill requirement: fire extinguishing engineer  Before replacing the heat detector, inform the related administration department of the temporary downtime of the fire control system.
  • Page 133: Replacing A Gas Release Indicator

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-42 Terminals on the heat detector base Terminal definitions (no polarity, two-wire)  1: L2 (connected to the common terminal)  2: L1 (connected to a lower-level device) ...
  • Page 134: Replacing A Fire Alarm Horn Strobe

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Documents required: fire extinguishing device layout diagram Skill requirement: fire extinguishing engineer For the diagram and table, see the initial configuration guide. Procedure Step 1 Cut off the power supply to the fire control panel, remove screws securing the gas release...
  • Page 135 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Preparations Tools: Phillips screwdriver, flat-head screwdriver, utility knife, step ladder Material: spare fire alarm horn strobe Documents required: fire extinguishing device layout diagram Skill requirement: fire extinguishing engineer For the diagrams and tables, see the initial configuration guide.
  • Page 136: Replacing A Fire Alarm Bell

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement 5.4.5 Replacing a Fire Alarm Bell Prerequisites  A fire alarm bell is faulty.  A spare fire alarm bell of the same model is available and functional. Impact on the System...
  • Page 137: Replacing The Emergency Start/Abort Buttons

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-46 Cutting off the power cable Step 3 Connect the input cables with the two power cables of the spare fire alarm bell (polar insensitive). Step 4 Install the new fire alarm bell.
  • Page 138 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Skill requirement: fire extinguishing engineer For the diagram, see the initial configuration guide. Procedure Step 1 Use a Phillips screwdriver to remove the screws from the emergency start and abort buttons,...
  • Page 139: Replacing A Battery In The Vesda Power Box

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Follow-up Procedure Dispose of the removed emergency start/abort button that is confirmed faulty. 5.4.7 Replacing a Battery in the VESDA Power Box Prerequisites  A battery in the VESDA power box is faulty.
  • Page 140: Replacing A Fire Cylinder

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Step 4 Remove the faulty VESDA battery using a Phillips screwdriver, and install the spare VESDA battery into the power box. Step 5 Connect battery cables. Distinguish between the positive and negative battery terminals when connecting battery cables.
  • Page 141 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement  Do not impact or strike the fire cylinder during transportation or installation.  Assign sufficient people for transportation and installation if no auxiliary tool is available. Step 2 Disconnect the cables between the solenoid valve and the fire control panel, as shown in Figure 5-49.
  • Page 142 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-50 Position of the cable to the solenoid valve Step 4 Disconnect the cable to the pneumatic switch, as shown in Figure 5-51. Figure 5-51 Position of the cable to the pneumatic switch...
  • Page 143 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-52 Removing the high-pressure hose and adapter Step 6 Loosen the clamps on the fire cylinder using a Phillips screwdriver. Step 7 Move the fire cylinder out of the installation position.
  • Page 144: Replacing A Fire Control Panel

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-53 Position of the safety pin Tighten the screw using a Phillips screwdriver. ----End Follow-up Procedure Dispose of the removed fire cylinder that is confirmed faulty. 5.4.9 Replacing a Fire Control Panel Prerequisites ...
  • Page 145: Replacing An Emergency Light

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Procedure Step 1 Switch off the power circuit breaker of the fire control panel. Step 2 Open the fire control panel and make a note of the cable connection.
  • Page 146 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Materials: spare emergency light Documents required: power supply and distribution system diagram Skill requirement: fire extinguishing engineer For the diagram, see the initial configuration guide. Procedure Step 1 Switch off the corresponding circuit breaker in the PDC.
  • Page 147: Replacing Fire Extinguishing System Components (Ce)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement 5.5 Replacing Fire Extinguishing System Components (CE) 5.5.1 Replacing a Smoke Detector Prerequisites  A smoke detector needs to be replaced.  A spare smoke detector of the same model is available and functional.
  • Page 148: Replacing A Heat Detector

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Follow-up Procedure Dispose of the removed smoke detector that is confirmed faulty. 5.5.2 Replacing a Heat Detector Prerequisites  A heat detector needs to be replaced.  A spare heat detector of the same model is available and functional.
  • Page 149: Replacing A Gas Release Indicator

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Follow-up Procedure Dispose of the removed heat detector that is confirmed faulty. 5.5.3 Replacing a Gas Release Indicator Prerequisites  A gas release indicator is faulty.  A spare gas release indicator of the same model is available and functional.
  • Page 150: Replacing An Audible And Visual Alarm

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Step 5 Check whether the new gas release indicator is working properly. ----End Follow-up Procedure Dispose of the gas release indicator that is confirmed faulty. 5.5.4 Replacing an Audible and Visual Alarm Prerequisites ...
  • Page 151: Replacing A Buzzer

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-57 Audible and visual alarm Step 3 Install the new audible and visual alarm, and connect cables to the audible and visual alarm. Ensure that the polarities of the cable are correct.
  • Page 152: Replacing The Emergency Abort Button

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Skill requirement: fire extinguishing engineer For the diagram and table, see the initial configuration guide. Impact on the System None Procedure Step 1 Remove the screws securing the buzzer and base using a flat-head screwdriver to separate the buzzer from the base.
  • Page 153: Replacing A Battery In The Vesda Power Box

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Documents required: fire extinguishing device layout diagram Skill requirement: fire extinguishing engineer For the diagram, see the initial configuration guide. Procedure Step 1 Remove the screws on the panel of the emergency abort button using a Phillips screwdriver,...
  • Page 154 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Preparations Tools: Phillips screwdriver, protective gloves Materials: spare VESDA power box battery, key to the VESDA power box door Documents required: fire extinguishing device layout diagram Skill requirement: fire extinguishing engineer For the diagram, see the initial configuration guide.
  • Page 155: Replacing A Fire Cylinder

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Follow-up Procedure Dispose of the removed VESDA power box battery that is confirmed faulty. 5.5.8 Replacing a Fire Cylinder Prerequisites  A fire cylinder needs to be replaced. ...
  • Page 156: Replacing A Fire Control Panel

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Figure 5-61 Fire cylinder (1) Electromagnetic valve (2) Flexible hoses (3) Container valve (4) Connector kit (5) Fire cylinder Step 8 Connect the cables between the solenoid valve and the fire control panel.
  • Page 157 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement Procedure Step 1 Power off the fire control panel. Step 2 Open the fire control panel and record the cable connections and labels. Figure 5-62 Fire control panel Step 3 Remove cables and the faulty fire control panel, remove the batteries from the faulty fire control panel, install the new fire control panel, and reconnect cables.
  • Page 158: Replacing An Emergency Light

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 5 Parts Replacement 5.5.10 Replacing an Emergency Light Prerequisites  An emergency light needs to be replaced.  A spare emergency of the same model is available and functional. Impact on the System...
  • Page 159: Emergency Operations

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 6 Emergency Operations Emergency Operations 6.1 Emergency Operations for Mains Failure Prerequisites The mains supply to the IDS1000 is faulty. Context The IDS1000 power supply and distribution system supports the following power supply modes: ...
  • Page 160: Emergency Operations For Circuit Breaker Tripping

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 6 Emergency Operations  If the switchover fails, manually start the DG within 5 minutes after the power outage occurs. If the DG still cannot be started, back up data immediately. ...
  • Page 161: Overload Emergency Operations

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 6 Emergency Operations 6.3 Overload Emergency Operations Prerequisites An overload alarm is generated. Procedure Step 1 Locate the cable or device based on the alarm information. Step 2 Check the overloaded cable or device and locate the fault.
  • Page 162: Emergency Operations For Overtemperature

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 6 Emergency Operations Follow-up Procedure Analyze the cause of the fault, and work out and record the preventive measures. 6.5 Emergency Operations for Overtemperature Prerequisites The IDS1000 is experiencing overtemperature or an overtemperature alarm is generated.
  • Page 163: Emergency Operations For High Hydrogen Density

     If any cable is not properly connected, reconnect the cable and check whether the fault is rectified.  If cables are properly connected, contact Huawei technical support. ----End Follow-up Procedure Analyze the cause of the fault, and work out and record the preventive measures.
  • Page 164: Emergency Operations For Container Door Cannot Open

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 6 Emergency Operations Step 3 Open doors of the power supply or battery compartment to dissipate the hydrogen. Do not use open flames or generate sparks in and around the IDS1000. Step 4 Troubleshoot by referring to 4.14 Hydrogen...
  • Page 165: Emergency Operations For Container Door Open

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 6 Emergency Operations  The access controller is faulty. Replace it by following instructions in 5.3.13.7 Replacing an Access Controller. Step 4 (Optional) After the fault is rectified, replace by following instructions in 5.3.13.5 Replacing...
  • Page 166: Emergency Operations For A Single Fire Alarm (Standard)

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 6 Emergency Operations If a fire alarm is generated, determine whether to extinguish the fire or leave the area immediately based on the actual situation and contact the personnel on duty or local fire station.
  • Page 167 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 6 Emergency Operations If a fire alarm is generated, determine whether to extinguish the fire or leave the area immediately based on the actual situation and contact the personnel on duty or local fire station.
  • Page 168: Emergency Operations For A Composite Fire Alarm (Standard)

    Verify that the settings are correct and check whether the alarm disappears. If the alarm disappears, the troubleshooting ends.  If the settings are correct but the alarm persists, contact Huawei technical support. ----End Follow-up Procedure Analyze the cause of the fault, and work out and record the preventive measures.
  • Page 169: Emergency Operations For A Gas Release Alarm (Ce)

     If the settings are correct and the alarm disappears, the troubleshooting ends.  If the settings are correct but the alarm persists, contact Huawei technical support. ----End Follow-up Procedure Analyze the cause of the fault, and work out and record the preventive measures.
  • Page 170  If the settings are correct and the alarm disappears, the troubleshooting ends.  If the settings are correct but the alarm persists, contact Huawei technical support. ----End Follow-up Procedure Analyze the cause of the fault, and work out and record the preventive measures.
  • Page 171: Ids1000 Emergency Exit Guide

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide 7 IDS1000 Emergency Exit Guide IDS1000 Emergency Exit Guide If an emergency occurs, push open the nearest container door shown in the emergency exit diagram with force, as shown in Figure 7-1.
  • Page 172: A Acronyms And Abbreviations

    IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide A Acronyms and Abbreviations Acronyms and Abbreviations Alternating Current Advanced Cooling Controller automatic transfer switch control area network Conformite Europende digital distribution frame diesel generator energy control center ElectroStatic Discharge Global System for Mobile Communications...
  • Page 173 IDS1000-A Air-Cooled Container Data Center All-in-One Maintenance Guide A Acronyms and Abbreviations liquid crystal display monitor display module power over Ethernet power distribution cabinet power distribution unit subscriber identity module rPDU rack power distribution unit uninterruptible power system video cloud node...

Table of Contents