Page 2
Checking Quantities and Types of Goods Number of Device Type Device Quantity Remarks terminals 1 AR2220, 1 S5752, 3 S3752s, 1 PDB, 1 UPS (6 kVA), 1 PDU, 1 Typical Micro DC All-in-One cabinet fan assembly, and 1 monitoring system (including 1 ECC, 1 configuratio temperature and humidity sensor, 1 water leakage sensor, 2 door n suite...
Page 3
Installation Planning For 150 terminals All-in-One cabinet...
Page 6
Labeling Labeling for Network Devices The rack is divided into 42 U (1 U = 1.75 in.), numbering from 1 to 42 from the bottom up. For the network device occupying more than 1 U, the label records the smallest height number. For example, if a 2 U network device occupies 34 U and 35 U, "34U"...
Page 7
Checking Quantities and Types of Goods > Inspecting Goods > Installing the Typical Configuration Suite > Installing the All-in-One cabinet (for All Scenarios) Remove reinforcing brackets from Combine and level cabinets. the cabinet. There is one reinforcing bracket at the height of 22 U (38.5 in.) in the front and rear of the cabinet.
Checking Quantities and Types of Goods > Inspecting Goods > Installing the Typical Configuration Suite > Installing the All-in-One Cabinet > (Optional) Installing the SIM Card (for All Scenarios) Install the subscriber identity module (SIM) Remove the General Packet Radio Service card.
Page 9
Checking Quantities and Types of Goods > Inspecting Goods > Installing the Typical Configuration Suite > (Optional) Installing Battery Packs (for All Scenarios) Positions for installing Battery Packs If customers require more than 1 hour backup power, install a battery cabinet or battery packs. ...
Page 10
Checking Quantities and Types of Goods > Inspecting Goods > Installing the Typical Configuration Suite > Installing Servers (for All Scenarios) Only one RH2288 is provided by default for Micro DC typical configurations for 150, 300, and 600 terminals. ...
Page 11
Checking Quantities and Types of Goods > Inspecting Goods > Installing the Typical Configuration Suite > Installing Extension Components > Installing the Integrated Sensor Mounting Arm (for All Scenarios) Securing the sensor mounting arm Two persons are required to install the sensor mounting arm with the help of a step ladder. ...
Page 12
Checking Quantities and Types of Goods > Inspecting Goods > Installing the Typical Configuration Suite > Installing Extension Components > Installing the Integrated Sensor Mounting Arm (for All Scenarios) Connect a signal cable for the smoke sensor. Insert the signal cable connector into the correct position on the transfer board.
Page 13
If customers require more than 1 hour backup power, install a battery cabinet. The battery cabinet is installed in the same way as the All-in-One cabinet. For details about how to install batteries, see the Micro DC V100R001C00 Installation and Operation Guide.
Page 14
Checking Quantities and Types of Goods > Inspecting Goods > Installing the Typical Configuration Suite > Installing Extension Components > Inspecting Devices Before Power-On Inspecting the PDB Commissioning mechanical performance 1. Switch on and off all circuit breakers five times. Ensure that they can be switched on and off smoothly. 2.
Checking Quantities and Types of Goods > Inspecting Goods > Installing the Typical Configuration Suite > Installing Extension Components > Inspecting Devices Before Power-on > Performing Power-On and Power-Off Tests UPS front panel Circuit breaker on the battery pack PDU input circuit breaker Input circuit breaker on the UPS backplane...
4. Keep the UPS running without loads for 10 minutes. Shutting down the UPS Press on the UPS panel to shut down the UPS. Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China http://enterprise.huawei.com...