Installing the Fuse
Inset the fuse (25 A) into the fuse block at the second
fuse slot from the left
(Figure
Note:
The fuse may not need to be installed if a fuse
has already been installed from another Toro kit.
1. Fuse (25 A)
6
Connecting the Battery
No Parts Required
Procedure
Connect the battery; refer to the electrical system
maintenance section of your Operator's Manual.
7
Adjusting the Cooling Fan
Position
No Parts Required
Procedure
1.
Seat the operator of the machine in the
operator's seat.
2.
Rotate the fan switch to medium-fan speed.
3.
Determine if the operator wants the airstream of
the cooling fan moved forward or rearward:
11).
Figure 11
2. Fuse slot—second from
left (switch panel fuse
block)
•
If the airstream position is correct, shut off
the cooling fan.
•
If the operator wants the airstream of the
cooling fan moved, perform the following
steps:
A.
Shut off the cooling fan.
B.
Remove the 4 carriage bolts (1/4 x 5/8
inch) and 4 flange locknuts (1/4 inch)
that secure the switch panel to the left
and right side-frame channels
12).
g244641
1. Flange locknut (1/4 inch)
2. Switch panel
C.
Move the switch panel forward or
rearward
fan the position that you determined in
step 3.
Note:
of 5 positions.
6
Figure 12
3. Carriage bolt (1/4 x 5/8
inch)
4. Side-frame channel
(Figure
13) to align the cooling
You can set the cooling fan to 1
(Figure
g244667