Installing the Fuse

Inset the fuse (25 A) into the fuse block at the second
fuse slot from the left
(Figure
Note:
The fuse may not need to be installed if a fuse
has already been installed from another Toro kit.
1. Fuse (25 A)
6

Connecting the Battery

No Parts Required
Procedure
Connect the battery; refer to the electrical system
maintenance section of your Operator's Manual.
7
Adjusting the Cooling Fan
Position
No Parts Required
Procedure
1.
Seat the operator of the machine in the
operator's seat.
2.
Rotate the fan switch to medium-fan speed.
3.
Determine if the operator wants the airstream of
the cooling fan moved forward or rearward:
11).
Figure 11
2. Fuse slot—second from
left (switch panel fuse
block)
If the airstream position is correct, shut off
the cooling fan.
If the operator wants the airstream of the
cooling fan moved, perform the following
steps:
A.
Shut off the cooling fan.
B.
Remove the 4 carriage bolts (1/4 x 5/8
inch) and 4 flange locknuts (1/4 inch)
that secure the switch panel to the left
and right side-frame channels
12).
g244641
1. Flange locknut (1/4 inch)
2. Switch panel
C.
Move the switch panel forward or
rearward
fan the position that you determined in
step 3.
Note:
of 5 positions.
6
Figure 12
3. Carriage bolt (1/4 x 5/8
inch)
4. Side-frame channel
(Figure
13) to align the cooling
You can set the cooling fan to 1
(Figure
g244667