Forward Power Test Analysis; Table 3-4 Parameter Associated With The Forward Power Test - Huawei Airbridge BTS3606E Commissioning Manual

Table of Contents

Advertisement

Airbridge BTS3606E&3606AE
System Commissioning Guide
Step 6 If the result is normal, conduct forward power interface tracing and compare the test result
with the power test result.
For example, to trace the CMTR or OMTR configured in slot 2, execute the following
commands:
HW CBTS>str infotrace
<(brdtp=?bckm_omu/bckm_sig/bckm_clk/bcim/ccpm/trm), mandatory >trm
<(brdid=?),mandatory >2
<(item=?),optional>"power"
ok
Step 7 Stop forward power interface tracing.
For example, to stop tracing the CMTR or OMTR configured in slot 2, execute the following
commands:
HW CBTS>stp infotrace
<(brdtp=?bckm_omu/bckm_sig/bckm_clk/bcim/ccpm/trm), mandatory >trm
<(brdid=?),mandatory >2
<(item=?),optional>"power"
ok
Step 8 Repeat steps 1 to 5 to test other CMTRs or OMTRs.
Step 9 Stop the power test as follows:
HW CBTS>stp trmpowertst
<(brdid=?),mandatory >2
<(chid=?),mandatory >1
ok
----End

3.5.2 Forward Power Test Analysis

This section provides the parameters and analysis of forward power test results.
Troubleshooting methods are also provided for abnormal test results.
Parameter Description
Table 3-4 describes the parameters associated with the forward power test.

Table 3-4 Parameter associated with the forward power test

Parameter
Base band power
Digital power
Attenuation
Digital power sum
HPA Output power
HPA Input power
Issue 02 (2006-10-10)
Description
Set by the CSM5000 or CSM5500 of the CCPM or CECM
Digital power
Attenuation
Sum of digital power
Output power of the high power amplifier
Input power of the high power amplifier
Huawei Technologies Proprietary
3 Commissioning Process
3-23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airbridge bts3606ae

Table of Contents