4.
MOUNTING THE G.729 DAUGHTERBOARD
Follow the step-by-step procedure below, to install the G.729 daughter board.
1.
Make sure that you have the G.729 Daughter board.
2.
Open the cabinet. Use steps 4 till 6 in Chapter 3
3.
Take the PWB out of the cabinet.
Note: Mind the light conductor for the LEDs. It can drop off!
4.
Now you should have the AP300 PWB and the G.729 Daughter Board as separate
items.
5.
Remove the protection foil from the sticky part on the G.729 Daughter Board.
10
All rights reserved. Reproduction in whole or in part is prohibited without the written consent of the copyright owner
Figure 9. Light conductor for LEDs
Figure 10. G.729 Daughter Board with sticky foam
AP300 Customer Engineer Manual
LED Light
conductor
Sticky foam
March 2010