Download Print this page
ABB TRIO-20.0-TL-OUTD-X-US-480 Manual

ABB TRIO-20.0-TL-OUTD-X-US-480 Manual

Programming for heco compliance

Advertisement

ABB solar inverters
Programming for HECO compliance
TRIO-20.0/27.6-TL-OUTD-X-US-480
Contents
1. Introduction ..................................................................................................................................................2
2. Parameter setting via inverter's display .......................................................................................................2
3. Parameter setting via software tool Aurora Manager Lite ............................................................................3
Appendix A: How to connect the laptop PC to the inverter ............................................................................6
Appendix B: How to launch Aurora Manager LITE ..........................................................................................7

Advertisement

loading

Summary of Contents for ABB TRIO-20.0-TL-OUTD-X-US-480

  • Page 1: Table Of Contents

    ABB solar inverters Programming for HECO compliance TRIO-20.0/27.6-TL-OUTD-X-US-480 Contents 1. Introduction ..............................2 2. Parameter setting via inverter’s display .......................2 3. Parameter setting via software tool Aurora Manager Lite ................3 Appendix A: How to connect the laptop PC to the inverter ................6...
  • Page 2: Introduction

    HECO requirement settings can be set via the TRIO’s LCD display using the service menu (accessible using the buttons on the inverter’s LCD panel) as shown in Figure 1 below. Note: to obtain the second level password, call ABB solar inverter post-sales technical support at 1-877-261-1374, 6 a.m.
  • Page 3: Parameter Setting Via Software Tool Aurora Manager Lite

    3. Parameter setting via software tool Aurora Manager Lite Aurora Manager Lite is a free ABB software which communicates with the ABB TRIO inverter by reading the inverter data, settings and sending commands. Contact ABB solar inverter post-sales technical support at 1-877-261-1374 to obtain the software and any required password.
  • Page 4 Next, click on the AC side tab, then the Grid protection tab, as shown in Figure 3 below. Voltage and Frequency grid parameters are all now accessible. Figure 3 - Click on the AC side tab, then the Grid protection tab To set the HECO parameters outlined in Table 1 on page 2 of this instruction, the boxes in the New columns must be changed as shown in Figure 4 below: Figure 4 - Change information in the New columns...
  • Page 5 Rather than changing the settings for each individual TRIO inverter in a daisy chain configuration, select Apply setup changes to ALL connected units at the top of the screen, as shown in Figure 5 below. Figure 5 - Apply setup changes changes to ALL connected units TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance 5...
  • Page 6: Appendix A: How To Connect The Laptop Pc To The Inverter

    Figure 6 - Communication board showing RS485 PC/SERV port above and terminal block below To use the Aurora Manager LITE software, connect the laptop PC to the inverter on the RS485 PC/SERV port of the communication board using an USB-RS485 Adapter (the ABB PVI-USB-RS232_485 Converter is recommended). The following steps must be performed: −...
  • Page 7: Appendix B: How To Launch Aurora Manager Lite

    Appendix B: How to launch Aurora Manager LITE Aurora Manager LITE software is available at no cost from ABB and allows the installer or customer to monitor the plant, as well as change inverter settings. To launch this software, once the inverter is connected to a laptop PC as described in Appendix A, access the COM settings as...
  • Page 8 This action will provide a list of active COM ports, which should include the RS485/USB adapter and list its associated COM port number (typically the associated COM is the one with the highest number). Baud rate remains 19200. See Figure 10 below. Figure 10 - List of active COM ports By clicking on Apply and then OK, the COM settings are confirmed.
  • Page 9 Figure 14 - Setup menu Fill in all fields, and finish by inserting the PASSWORD obtained from ABB solar inverter post-sales technical support and then clicking OK to confirm. New features will be available in the software. Press the REFRESH button and click on any inverter icon in the list, and new TABs will then appear, as shown in Figure 15 below.
  • Page 10 For more information please contact: www.abb.com/solarinverters © Copyright 2015 ABB. All rights reserved. Specifications subject to change without notice.

This manual is also suitable for:

Trio-27.6-tl-outd-x-us-480