6.6 Procedure
Use this procedure to install a A-020W-A CPE.
1
2
Figure 8
3
4
Issue: 01
Release 05.08.01 | June 2018 | Edition 01
Place the unit on a flat surface, such as a desk or shelf.
Note — The A-020W-A CPE cannot be stacked with another A-020W-A
or with other equipment. The installation requirements are:
•
allow a minimum 100 mm clearance above the top cover
•
allow a minimum 50 mm clearance from the side vents
•
do not place any heat source directly above the top cover or below the
bottom cover
Review the connection locations as shown in Figures 8.
A-020W-A connections
Connect the Ethernet cables to the RJ-45 ports; see Figure
ports.
Connect the WAN cable to the RJ-45 WAN port; see Figure
WAN port.
3FE-47511-AAAA-TCZZA
LAN 1
LAN 2
WAN
ON/OFF
8
for the location of the RJ-45
8
for the location of the RJ-45
Install a A-020W-A