Screw fastening torque by sampling
High-voltage cable connection
Module connections
Switchgear connections
3.9.10 AC Input Commissioning
When the installation and assembly of the battery system is complete, notify the system supplier for
system commissioning. Special tools and training are required for commissioning.
CAUTION
Do not energize the input or control power prior to commissioning.
ET003222373
English 4/2018. Rev 0.0
.
Assembling the Product
3
87