After all the devices are installed, check the power-on status of an RU.
After you unpack an RU, you must power on it within 24 hours. If you power off the RU for
maintenance, you must restore power to the RU within 24 hours.
Figure 11-1
For details about how to power on an RU, see Powering On an RU. For details about how to power off
an RU, see section "Powering-Off the RU" in RU Maintenance Guide.
Issue 05 (2014-06-30)
11
shows the RU power-on check process.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

Powering On an RU

11 Powering On an RU