(1) Lifting sling
Do not remove the stretch sling and protection pipe or bind fiber optic cables using one sling,
as shown in
3.
4.
Issue 05 (2014-06-30)
Figure 7-7 Binding fiber optic cables
Figure
7-8.
Figure 7-8 Incorrect binding method
Installation engineer B rotates the fiber spools at the speed of 5 m (16.4 ft) to 15 m
(49.21 ft) per minute to coil the fiber optic cables.
Installation engineer C pulls the lifting sling downwards, and installation engineer D
pulls the traction sling outwards to protect the fiber optic cables from colliding with the
tower.