SUN2000L-(2KTL-5KTL)
Quick Guide
Issue: 03
Part Number: 31508725
Date: 2018-05-30
1
Overview
2
Installing the Device
Installation Requirements
2.1
Tilt and Space
NOTE
If multiple inverters need to be installed, see SUN2000L-(2KTL-5KTL) User Manual for the installation dimensions.
Installing the Mounting Bracket
2.2
Support-mounted Installation
(1) Front panel
(3) Mounting bracket
(5) LED
(7) DC input terminals (PV1+/PV1–) (8) DC input terminals (PV2+/PV2–)
(9) Battery terminals (BAT+/BAT–)
(11) AC output port (AC)
(13) Antenna port (ANT)
(15) Ground point
Prepare M8 stainless bolt assemblies (including flat washers, spring washers, and M8 bolts) with
appropriate lengths as well as matched flat washers and nuts based on the support specifications.
You are advised to
apply anti-rust paint
on the hole
positions for
protection.
1
Copyright © Huawei Technologies Co., Ltd. 2018. All rights reserved.
NOTICE
1. The information in this document is subject to change without
notice. Every effort has been made in the preparation of this
document to ensure accuracy of the contents, but all statements,
information, and recommendations in this document do not
constitute a warranty of any kind, express or implied.
2. Before installing the device, closely read the user manual to get
familiar with product information and safety precautions.
3. Only certified electricians are allowed to operate the device.
Operation personnel must wear proper personal protective
equipment (PPE) all the time.
4. Before installing the device, check that the package contents are
intact and complete against the packing list. If any damage is
found or any component is missing, contact your dealer.
5. Huawei shall not be liable for any consequence caused by
violation of the storage, transportation, installation, and operation
regulations specified in this document and the user manual.
Dimensions
(2) Mounting plate
(4) Heat sink
(6) DC switch (DC SWITCH)
(10) COM port (COM)
(12) Ventilation valve
(14) Alarm port (ALARM)