2.2 Mounting

The 169 should be positioned so that the display is visible and the front panel keypad is accessible. A cut-out is
made in the mounting panel and the unit is mounted as shown in Figure 2-3. Four washers and 10-32 X 3/8"
mounting screws are provided.
Although the 169 circuitry is internally shielded, to minimize noise pickup and interference the relay should be placed
away from high current conductors or sources of strong magnetic fields.
Connections to the relay are made through terminal blocks and CTs located on the rear of the unit.
Figure 2-3 Relay Mounting