L
C
C
I
IGHTING
ONTROL
ONSOLE
UNPACK
1. Site Requirements
The console and its components require a sturdy, flat surface for installation. The surface should be able to support
the weight of the console (including the processor, monitor, etc.) and should provide suitable ventilation. Also, the
site should be clean (i.e. absent of any construction dust or debris) and dry. Before setting up, ensure that the
installation site meets these requirements. Refer to
requirements.
2. Product Care
In the event the console needs to be cleaned, remove all power from unit and use only a very mild soap on a damp
cloth. Dry immediately with a soft lint-free cloth after cleaning. Never use harsh chemicals such as window cleaners,
paint removers, vinyl conditioners, etc.
It is recommended to gently blow out the sub pots and desk occasionally to prevent build up of dust and dirt.
3. Unpack and Assemble Components
To unpack and assemble the console components, do the following:
Step 1. Remove console components from shipping container or case.
Step 2. Place console desk on installation surface.
Step 3. Place monitor and other external components close enough to console so that cabling will reach.
Step 4. Proceed to
1 0
UNPACK
& S
G
NSTALLATION
ETUP
UIDE
"HOOK-UP" on page
"Specifications" on page 69
11.
Palette VL
for console dimensions and power