Preparing for installation

Preparing for installation
This section describes the checks to be performed before proceeding with site
hardware installation.
Use the installation report to determine which installation options are required. Refer
to
PTP LINKPlanner

Unit pre-configuration

It is common practice to pre-configure the units during staging before site installation
by performing the following tasks from
x
Connecting to the unit
x
Upgrading firmware version
x
Using the installation wizard
If the units are to be pre-configured during staging, the safety precautions below
MUST be observed.

Safety precautions

All national and local safety standards must be followed while developing a site,
installing equipment, or performing maintenance.
WARNING
o
o
5-2
on page 2-8.
on page
Ensure that personnel are not exposed to unsafe levels of RF energy.
The units start to radiate as soon as they are powered up. Respect the
safety standards defined in
page 4-22, in particular the minimum separation distances. Observe
the following guidelines:
Never work in front of the antenna when the ODU is powered.
Always power down the PoE power supply when connecting and
disconnecting the drop cable from either the PoE power supply or ODU.
Chapter 6 Configuration and
6-3
on page
6-10
on page
6-14
Compliance with safety standards
Chapter 5 Installation
alignment:
on
phn-2182_002v000
May 2011

Advertisement

Table of Contents
loading

Table of Contents