Mechanical Installation; How To Get Started - GE AF-600 FP Operating Instructions Manual

Fan and pump drive 460v/575v 150hp and above
Hide thumbs Also See for AF-600 FP:
Table of Contents

Advertisement

Mechanical Installation

4 Mechanical Installation

4.1 How to Get Started

This chapter covers mechanical and electrical installations
to and from power terminals and control card terminals.
4
4
Electrical installation of options is described in the relevant
Operating Instructions and Design Guide.
WARNING
Read the safety instructions before installing the unit.
Failure to follow recommendations could result in death or serious injury.
Mechanical Installation
Mechanical mounting
Electrical Installation
Connection to Mains and Protecting Earth
Motor connection and cables
Fuses and circuit breakers
Control terminals - cables
Quick Setup
keypad
Auto Tune
Programming
Unit size is depending on enclosure type, power range and
mains voltage
40
AF-600 FP High Power Operating Instructions
The frequency converter is designed to achieve a quick
and EMC-correct installation by following the steps
described below.
Illustration 4.1 Diagram showing basic installation including
mains, motor, start/stop key, and potentiometer for speed
adjustment.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents