Optional) Installing The Cabinet And Cabinet Cables; Installation Clearance Requirements - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 LampSite
Installation Guide
14
About This Chapter
This section describes the procedure and precautions for installing a cabinet and cables
connected to it. The cabinet can be installed on the wall, pole, channel steel, angle steel, steel
mesh, or ground by using mounting kits. Vertical and horizontal installation modes are
supported when the cabinet is installed on the steel mesh.

14.1 Installation Clearance Requirements

This section describes the recommended and minimum clearances for a cabinet.
14.2 Mounting Bracket and Attachment Plate
This section describes mounting brackets and attachment plates for installing a cabinet.
14.3 Installing a Cabinet
This section describes the procedure and precautions for installing a cabinet.
14.4 Installing Cabinet Cables
This chapter describes the procedure for installing cabinet cables.
14.1 Installation Clearance Requirements
This section describes the recommended and minimum clearances for a cabinet.
When installing a cabinet, the following clearance requirements should be met.
Figure 14-1 show the recommended clearances for installing a cabinet.
Issue 08 (2016-05-30)
(Optional) Installing the Cabinet and
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

14 (Optional) Installing the Cabinet and Cabinet Cables

Cabinet Cables
239