Advertisement

Owner's Manual & Assembly Instructions
BW01
Model No.
713781005
BUILDING DIMENSIONS
*Approx.
Foundation
Size
Size
12' x 10'
141 1/8" x 111 3/4" 110
12' x 17'
141 1/8" x 198"
12' x 24'
141 1/8" x 284 1/4" 278
12' x 31'
141 1/8" x 370 1/2"
3,7m x 3,1m
3,58m x 2,84m
3,7m x 5,2m
3,58m x 5,03m
3,7m x 7,3m
3,58m x 7,22m
3,7m x 9,5m
3,58m x 9,41m
VT1210-A
VT1231-A
697.68609-A
697.68611-A
* Size rounded off to the nearest foot
Storage Area
Sq. Ft. Cu. Ft.
801
194
1419
2037
362
2655
2
3
10,2m
22,7m
2
3
18,0m
40,2m
2
3
25,8m
57,7m
2
3
33,6m
75,2m
VT1217-A
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Exterior Dimensions
(Roof Edge to Roof Edge)
Width
Depth
Height
146 1/8"
117"
103 1/4"
146 1/8"
203 1/4"
103 1/4"
146 1/8"
289 1/2"
103 1/4"
146 1/8"
375 3/4"
103 1/4"
3,71m
2,97m
2,62m
3,71m
5,16m
2,62m
3,71m
7,35m
2,62m
3,71m
9,54m
2,62m
VT1224-A
697.68608-A
697.68610-A
Interior Dimensions
(Wall to Wall)
Width
Depth
Height
141 1/8"
111 3/4"
102"
141 1/8"
198"
141 1/8"
284 1/4"
141 1/8"
370 1/2"
3,58m
2,84m
2,59m
3,58m
5,03m
2,59m
3,58m
7,22m
2,59m
3,58m
9,41m
2,59m
102"
102"
102"

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VT1210-A and is the answer not in the manual?

Questions and answers

Summary of Contents for Arrow VT1210-A

  • Page 1 Owner's Manual & Assembly Instructions BW01 Model No. VT1210-A VT1217-A VT1224-A VT1231-A 697.68608-A 697.68609-A 697.68610-A 697.68611-A CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ...
  • Page 2: Carton

    Anchoring and foundation materials are not included with your building. We recommend the use of an Arrow Anchoring Kit as an effective method of securing your building to the foundation (Available by mail order or at your local dealer) or you may construct the foundation and anchoring system of your choice.
  • Page 3 PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 4 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
  • Page 5 Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation.
  • Page 6 ATTIC KIT / WORKBENCH KIT FLOOR FOUNDATION KITS Heavy-duty galvanized steel bars that fit all 10' wide Arrow buildings. They install quickly and easily to help organize space and create more useable space as an attic or workbench.
  • Page 7 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 8 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 9 Foundation The Foundation For Your Building Concrete Slab The slab should be at least 4" (10cm) thick. It must be level and flat to provide good support for the frame. The following are the recommended materials for your foundation. 2 x 4's (5cm x 10cm) (will be removed once the concrete cures) Concrete Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of:...
  • Page 10 It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia.
  • Page 11 #10-32x1/4" Bolts (4) (Packed with Screws) (Packed with Screws) (Packed with Screws) 66444 66646 Roof Trim Cap 66446 (Arrow Logo) 66610 (No Slot) Washer (600) Peak Cap (2) #10-32x7/16" Bolt (2) (2 right & 2 left) (320) (Carton 5) 66265...
  • Page 12: Table Of Contents

    Parts List BW12 Carton #5 of the 12' x17' can be deleted for a complete 12' x10' building, or more than one carton #5 may be used to extend depth in multiples of 7'. Carton 3 & 4 Assembly Part Part Wayne Dalton Key No.
  • Page 13 Assembly by Key No. BW13...
  • Page 14: 7855 Truss Lower Chord

    7855 Truss Lower Chord (2) Parts Needed For 7856 Truss Upper Chord (2) Step 1 6382 Center Gable Brace (8) Truss Assembly 12x17, 12x24 & 12x31 7739 Truss Diagonal (4) 6381 Mid Gable Brace (4) ONLY 6380 Outer Gable Brace (4) BW14 7738 Splice Plate (1) Assemble 1/2 truss at a time, using...
  • Page 15 6381 Mid Gable Brace (4) Step 2 Parts Needed For 6380 Outer Gable Brace (4) Gables All Sizes 7942 Right Gable (2) 7943 Left Gable (2) BW15 The gables go on top of the front and rear walls to support the roof beams. The gables are packed nested to- gether and might be mistaken as 1 piece.
  • Page 16: 7834 Right Front Frame

    8532 Right Rear Frame (1) 8531 Left Rear Frame (1) Step 4 Parts Needed For 7837 Side Frame (2) 7834 Right Front Frame (1) Floor Frame Assembly 12x10 7835 Left Front Frame (1) 7517 Lower Door Track (1) BW16 7560 Ramp (1) The rear floor frame is made up of 2 Position floor frames as shown Select location of side door on...
  • Page 17 Parts Needed For 8532 Right Rear Frame (1) 7837 Side Frame (2) Step 5 8531 Left Rear Frame (1) 7834 Right Front Frame (1) Floor Frame Assembly 7914 Side Frame (see below) 7835 Left Front Frame (1) 7857 Truss Support (see below) 7517 Lower Door Track (1) 12x17, 12x24, 12x31 7560 Ramp (1)
  • Page 18: 7824 Corner Wall Panel

    7824 Corner Wall Panel (4) Step 6 Parts Needed For 7825 Front Wall Panel (2) Corners All Sizes 7822 Main Wall Panel (2) BW18 Narrow Side 7824 Each screw and bolt in the wall re- Wide Side quires a washer. REAR Install a corner wall panel at the 7824...
  • Page 19 Rear Frame Assembly (1) 7834 Right Front Frame (1) Step 7 Parts Needed For 7835 Left Front Frame (1) 7837 Side Frame (2) Frames 12x10 7950 Side Wall Channel (1) 7949 Side Wall Channel (1) BW19 7951 Support Channel (1) The mid frame pieces give rigidity to Fasten side frame to the corner the side and rear wall.
  • Page 20: 6228 Frame Support

    Parts Needed For Rear Frame Assembly (1) 7837 Side Frame (2) Step 8 7834 Right Front Frame (1) 6228 Frame Support (4) Frames 7835 Left Front Frame (1) 7949 Side Wall Channel (1) 7917 Truss Column (see below) 7951 Support Column (1) 12x17, 12x24 &...
  • Page 21: 7839 Front Column

    7839 Front Column (2) 7834 Right Front Frame (1) Step 9 Parts Needed For 7835 Left Front Frame (1) Frames 12x10 7831 Lintel (1) Rear Frame Assembly (1) 7838 Side Top Angle (2) BW21 7958 Door Track (1) The top frame pieces give rigidity to Position rear frame assembly the side walls and provide a surface across top of main wall panels and...
  • Page 22 Parts Needed For 7839 Front Column (2) Rear Frame Assembly (1) Step 10 Frames 7834 Right Front Frame (1) 7915 Side Top Angle (see below) 7835 Left Front Frame (1) 7838 Side Top Angle (2) 12x17, 12x24 & 12x31 7831 Lintel (1) 7958 Door Track (1) BW22 The top frame pieces give rigidity to...
  • Page 23: Medium Wall Panel

    Step 11 Parts Needed For 7822 Main Wall Panel (see below) Walls All Sizes 7823 Medium Wall Panel (1) BW23 Each wall panel has a crimped rib on IF YOU ARE BUILDING A 12x24 1 side. The crimped rib should go Install 3 additional main wall panels on under the rib of the panel that follows each side of the building.
  • Page 24: 7958 Door Track

    7517 Lower Door Track (1) Step 12 Parts Needed For 7560 Ramp (1) 8530 Splice Channel (1) Rear Entry Door All Sizes 7951 Support Column (1) 7958 Door Track (1) BW24 Using the previous side entry door steps and this illustration, you can install the entry door at 2 locations along the rear wall.
  • Page 25: 7946 Door Jamb

    7946 Door Jamb (2) 7948 Door Wall Brace (1) Step 13 Parts Needed For 7972 Door Handle Lock Bracket (1) Side or Rear Entry Door All Sizes BW25 The door jambs reinforce the door opening and provide an attractive trim. Follow these steps for both door jambs.
  • Page 26 Step 14 Parts Needed For 10460 Right Track Support (1) Track Supports All Sizes 10461 Left Track Support (1) BW26 Fasten right and left track sup- ports to the front columns using 5 bolts from the inside and nuts out- side.
  • Page 27 Right Gable Assembly (1) 10462 Roof Beam (4) Parts Needed For Step 16 Left Gable Assembly (1) Roof Beams 12x17, 12x24 & 12x31 6382 Center Gable Brace (1) 10462 Roof Beam Assembly (1) 6372 Gable Strut (2) BW27 Lift and fasten a right gable assem- Install single roof beams to the left bly at top of lintel using bolts &...
  • Page 28 Right Gable Assembly (1) Left Gable Assembly (1) Parts Needed For Step 17 7912 Roof Beam (4) Roof Beams 12x17, 12x24 & 12x31 6382 Center Gable Brace (1) 7912 Roof Beam Assembly (1) 6372 Gable Strut (2) BW28 Fasten gables to rear frame using all screws.
  • Page 29 Right Gable Assembly (2) Left Gable Assembly (2) Parts Needed For Step 18 6382 Center Gable Brace (2) Roof Beams 12x10 10462 Roof Beam (4) 10462 Roof Beam Assembly (1) 6372 Gable Strut (2) BW29 Lift and fasten a right gable as- Join left and right gables together Fasten a gable strut to the middle sembly at top of lintel using bolts &...
  • Page 30 Step 19 Squaring the Building All Sizes BW30 Square the building on the founda- tion and at the top, by measuring diagonally from corner to corner as previously done. Use string to check and see if the NOTE sides and rear of building are straight, The 95"...
  • Page 31 Parts Needed For Step 20 7826 Right Roof Panel (2) Corner Roof Panels All Sizes 7827 Left Roof Panel (1) BW31 Installing the roof panels is best done Install the left roof panel for the right with a step ladder. Each screw and side in the position shown.
  • Page 32: Middle Roof Panel 4

    Parts Needed For Step 21 7828 Middle Roof Panel (2) Roof Panels 12x10 BW32 Position middle roof panel over- lapping rib of left corner roof panel. Fasten overlap at center of roof panel rib using a bolt and nut. Fasten to roof beams as before using screws.
  • Page 33: Ridge Cap.

    Parts Needed For Step 22 7828 Middle Roof Panel Roof Panels 12x17, 12x24 & 12x31 (see below) BW33 IF YOU ARE BUILDING A 12x24 Position middle roof panel over- Cut 12 2" (5cm) strips. There are 3 extra lapping rib of left corner roof panel. middle roof panels on each side of building.
  • Page 34 7828 Middle Roof Panel (2) Parts Needed For Step 23 7843 Ridge Cap (1) Ridge Caps 12x10 7827 Left Roof Panel (1) 6874 Ridge Cap (1) BW34 Temporarily remove right rear roof panel. Install 2 middle roof panels. Fas- ten 2nd roof panel rib overlaps with a bolt and nut.
  • Page 35 7828 Middle Roof Panel (see below) Step 24 Parts Needed For 7843 Ridge Cap (see below) Ridge Caps 12x17, 12x24 & 12x31 7827 Left Roof Panel (1) 6874 Ridge Cap (1) BW35 Install the right and left roof Continue weather stripping and fas- panels at the rear gables.
  • Page 36: Side Roof Trim 2

    5220 Side Roof Trim (2) Step 25 Parts Needed For 6014 Side Roof Trim (2) Trim 12x10 7846 Right Rake (2) 7845 Left Rack (2) BW36 Attach the side roof trim to the Fasten roof panel rib, rake, peak lower end of the roof panels on each cap and ridge cap together using bolts side of the building using screws at and nuts.
  • Page 37 Step 26 Parts Needed For 5220 Side Roof Trim (see below) Trim 12x17, 12x24 & 12x31 6014 Side Roof Trim (2) 7845 Left Rack (2) 7846 Right Rake (2) BW37 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap.
  • Page 38 7945 Door (1) Step 27 Parts Needed For 3719 Door Handle Brace (1) Side or Rear Entry Door All Sizes 7947 Vertical Door Brace (1) 6264 Horizontal Door Brace (2) BW38 NOTE To assemble door to slide from left to right (opening), position door with handle holes on left side of door.
  • Page 39 Parts Needed For Step 28 Door Assembly (1) Side or Rear Entry Door All Sizes BW39 Position door slides onto the legs, from the end of door track, as shown in the end view. From inside the building, put the bottom of the door behind door jamb into the lower door track.
  • Page 40 This manual is packed with Right Track Support the garage door. The Arrow Own- ers Manual will be used for the attachment of the garage door to the building and for spring, snubber (safety) cable installation.
  • Page 41 Step 30 Parts Needed For 7913 Spring Support Bracket (2) Horizontal Track Roll-Up-Door BW41 Install spring support brackets to the roof beams using #10-32x7/16" bolts and #10-32 square nuts. Attach the right and left horizontal track to right & left vertical track using STEP bolts and nuts shown, following Wayne Dalton Instructions.
  • Page 42 Parts Needed For Step 31 7830 Right Door Jamb (1) Front Door Jambs All Sizes 7829 Left Door Jamb (1) BW42 Position right and left door jambs to right and left track supports with notched end on top, facing inside building.
  • Page 43 VT1210-A VT1217-A VT1224-A VT1231-A 697.68608-A 697.68609-A 697.68610-A 697.68611-A BW44 SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.

Table of Contents