Connecting Workpoint Clients; Making Trunk Connections; Performing A Visual Inspection - Siemens HiPath 3000 Service Manual

Hide thumbs Also See for HiPath 3000:
Table of Contents

Advertisement

4.4.3.11

Connecting Workpoint Clients

For information, see Chapter 10.
4.4.3.12

Making trunk connections

Refer to the following board descriptions for information:
STLS2 (Not for U.S.), STLS4 (S
TS2, HiPath 3550 only (S
TLA2 (Not for U.S.), TLA4 (Not for U.S.), TLA8 (Not for U.S.) (MSI)
TMAMF (for selected countries only), HiPath 3550only
TMGL4 (for U.S. only)
TMQ4 (for U.S. only)
TST1 (for U.S. only), HiPath 3550only
4.4.3.13

Performing a Visual Inspection

Before starting up the system, you must perform a visual inspection of the hardware, cables,
and the power supply. The visual inspection must be performed while the system is disconnect-
ed from the power supply.
Caution
7
Conduct the visual inspection only while the system is disconnected from the power
supply.
Always wear an antistatic wristband and observe the measures for protecting elec-
trostatically sensitive devices (see Page 1-9).
Step
1.
Compare the slots for the
installed boards with the
board assignment map.
2.
Check the local line voltage. Digital multimeter
After finishing the visual inspection, you can begin starting up the system as de-
>
scribed in Chapter 5.
P31003-H3550-S403-4-7620, 02/05
HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
Installing HiPath 3550, HiPath 3350, HiPath 3500, and HiPath 3300
trunk connection)
0
trunk connection)
2M
Activity
Board assignment map
Resources/Remarks
inst_h3.fm
Installing HiPath 3000
Possible remedies
Correct the board
configuration and no-
tify the sales depart-
ment.
4-185

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 5000

Table of Contents