Panasonic kx-ns0154la Installation Manual page 55

Dect 4-channel ip cell station unit
Table of Contents

Advertisement

Conditions for Configuring the Air Synchronization
Master CS2 must be within range of Master CS1.
It is recommended that Master CSs be placed in the middle of the installation site.
Both a Primary CS and Secondary CS should be assigned to Slave CSs.
When using only two CSs on the network (only two CSs are connected to the PBX), make sure that you
do not create a Master CS2.
All traditional CSs are automatically assigned and fixed as Master CS1.
When using IP-CSs and traditional CSs in the same area, make sure that you do not create a Master CS2.
When synchronizing CSs, do not create loops as in the examples below:
[Examples]
It is recommended that the number of levels in the synchronization hierarchy is minimized for stable air
synchronization. The maximum number of levels is 4.
5 Appendix
Installation Guide
55

Advertisement

Table of Contents
loading

Table of Contents