Cable Routing And Clamping; Figure 2-24 Cabling; Figure 2-25 Sub-Cover - NEC SL1000 Hardware Manual

Hide thumbs Also See for SL1000:
Table of Contents

Advertisement

ISSUE 3.0

1.6.6 Cable Routing and Clamping

1.
Depending on cabling requirement, select either a right or left route. Clamp and route cable to
outside.
2.
Cut and remove the Plastic Knockouts as needed from the Sub-Cover.
Sub-Cover
3.
Replace the Sub-Cover.
Hardware Manual
Cables

Figure 2-24 Cabling

Figure 2-25 Sub-Cover

Cable clamp
Plastic Knockouts
SL1000
2-19