Grounding - Fujitsu M10 Series Installation Planning Manual

Hide thumbs Also See for M10 Series:
Table of Contents

Advertisement

CHAPTER 6 Power Supply Facilities
(10)Power rating (for printer connection)
If a printer is connected to a UPS, selecting a UPS whose power capacitance is
sufficient to connect a printer is needed, by taking account of the following
precautions.
 Input voltage variation of a printer depends on the printing mode.
 Some laser printers requires few times higher than their rated power in toner
fixing.
(11)Checking the UPS environmental specifications and the warranty
term
Other precautions and requirements:
 UPS environmental specification
-
Input capacity
-
Grounding phase in input one-line grounding
-
External dimensions
-
Mass
-
Amount of heat dissipation
-
Earthquake-proofing actions
-
Noise level
-
Input/output terminals (connector)
 Warranty term
6.4

Grounding

Grounding should be planned to suit the following:
Grounding equipment in the computer room
Grounding other equipment
Grounding LAN devices
Grounding-plate method
 Grounding of surge absorbers
For the last, see
76
Chapter 7, "Protection Against Lightning."
C120-H007-08EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise seriesPrimequest series

Table of Contents