CHAPTER 6 Power Supply Facilities
6.7
Share of Responsibility for Construction in a
Computer Room
The share of responsibility for construction are :
Fujitsu will install wiring from the output terminal block in the distribution panel
to individual devices in the same room as a standard construction. The construction
of all other electrical requirements is the user' s responsibility.
The user is responsible for electrical wiring and receptacle for devices.
Figure 6.12
Figure 6.12 Share of responsibility for construction in a computer room
88
shows the share of responsibility for construction in the computer room.
C120-H007-08EN