Computer Room Installation Planning; Device Support Planning; Support Staff Assignment - Fujitsu M10 Series Installation Planning Manual

Hide thumbs Also See for M10 Series:
Table of Contents

Advertisement

1.2

Computer Room Installation Planning

Computer room installation requires prior device support planning and support staff
assignment.
1.2.1

Device support planning

Regarding the method of supporting device, the following items must be planned:
(1) Configuration of the server system and equipment to be added
 Environmental specifications for each room (such as dimensions, mass, voltages,
power requirements, heat dissipation, and temperature and humidity conditions)
 Scale templates for planning device layouts
 Kinds, numbers, and length limitations of signal cables used to connect devices
installed between rooms
(2) Quantities of storage media to be stored
CD, DVD, MO, magnetic tapes, floppy disks, printed forms, etc.
(3) Quantities of supplies and consumables to be stored
Print forms, ink ribbons, toner, photo-conductive drums, etc.
(4) Quantities of spare parts and maintenance tools to be stored
(5) Storage space for user's manuals
(6) Staff and visitor access management scheme
(7) Policy on carrying media and supplies in and out of the computer
room
1.2.2

Support staff assignment

To proceed the installation planning smoothly, an installation planning group
comprises the appointed staff of the user organization and Fujitsu is needed to be
organized.
C120-H007-08EN
1.2 Computer Room Installation Planning
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise seriesPrimequest series

Table of Contents