SECTION 5 - COMMISSIONING

5.1 GAS SUPPLY INSTALLATION

Inspect the entire installation including the gas meter, test for
tightness and purge. Refer to BS 6891 (I.S. 813 in ROI) for
specific instruction.

5.2 THE HEATING SYSTEM

The appliance contains components that may become damaged
or rendered inoperable by oils and/or debris that are residual
from the installation of the system, consequently it is essential
that the system be flushed in accordance with the following
instructions.

5.3 INITIAL FILLING OF THE SYSTEM

Ensure both flow and return service valves are open, remove
appliance casing as described in 4.7.1, identify the automatic air
release valves (AAV) and loosen the dust cap/s by turning the
cap anti-clockwise one full turn. Ensure all manual air release
valves located on the heating system are closed. Connect the
filling loop as shown in fig. 5, slowly proceed to fill the system
by firstly opening the inlet valve connected to the flow pipe, and
then turning the lever on the fill valve, to the open position. As
water enters the system the pressure gauge will begin to rise.
Once the gauge has reached 1 BAR close both valves and begin
venting all manual air release valves, starting at the lowest first.
It may be necessary to go back and top-up the pressure until
the entire system has been filled. Inspect the system for water
tightness, rectifying any leaks.
5.3.1 MANUAL AIR RELEASE (fig. 19)
When the boiler has been filled for the first time or the system
has been drained and refilled, it will be necessary to release
any air that may have become trapped within the appliance
heat exchanger. Slacken the bleed screw until water is released
and then close.
IMPORTANT, THERE ARE NO OTHER MANUAL AIR RE-
LEASE VALVES LOCATED ON THE APPLIANCE.
Fig. 19
16
Fig. 18

5.4 INITIAL FLUSHING OF THE SYSTEM

The whole of the heating system must be flushed both cold
and hot as detailed in 5.8. Open all radiator or heating valves
and the appliance flow & return service valve. Drain the boiler
and system from the lowest points. Open the drain valve full
bore to remove any installation debris from the boiler prior to
lighting. Refill the boiler and heating system as described in 5.3.

5.5 PRE-OPERATION CHECKS

Before attempting the initial lighting of the appliance, the fol-
lowing checks must be carried out:
• ensure all gas service valves from the meter to the appliance
are open and the supply pipe has been properly purged;
• ensure the proper electrical checks have been carried out,
(see 7.8) particularly continuity, polarity and resistance to
earth;
• ensure the 3 AMP fuse – supplied with the appliance – has
been fitted;
• ensure the system has been filled, vented and the pressure
set to 1 BAR;
• ensure the flue system has been fitted properly and in ac-
cordance with the instructions;
• ensure all appliance service valves are open.

5.6 INITIAL LIGHTING

Ensure the electrical supply to the appliance is switched on.
Ensure any external controls are switched to an 'ON' position
and are calling for heat. Move the selector switch to the ON
position, the appliance will now operate as described in 1.2.
Should the appliance fail to ignite, refer to 5.6 and/or section 7
(mode of operation, parameter setting & faultfinding).
5.7 CHECKING GAS PRESSURE AND
COMBUSTION ANALYSIS
The appliance is factory set so should require no additional
adjustment once installed. However to satisfy the require-
ments of GSIUR 26/9 (I.S. 813 ROI), it will be necessary to
gas rate the appliance using the gas meter that serves the
appliance and carry out a combustion analysis check in accor-
dance with BS 7967 (UK) to ensure that correct combustion is
occurring, see flow chart on page 30.
Additionally, if the gas valve has been adjusted, replaced, or
the appliance has been converted for use with another gas
type, then it becomes necessary to carry out a combustion
analysis check to ensure that correct combustion is occurring.
If there are no means to carry out a combustion analysis
check, then it will not be possible to complete the commissio-
ning procedure.
Details on how to carry out the combustion analysis can be
found in section 7.
IMPORTANT
It's imperative that a sufficient dynamic – gas – pressure is
maintained at all times. Should the dynamic gas pressure fall
below an acceptable level, the appliance may malfunction or
sustain damage.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Easi-Heat Plus 25C and is the answer not in the manual?

Questions and answers

Kenneth Murray
February 17, 2025

How do you connect the external pump to the boiler

This manual is also suitable for:

Easi-heat plus 29c

Table of Contents

Save PDF