Sharp MX-4110N Installation Manual page 98

Digital full color multifunctional system
Hide thumbs Also See for MX-4110N:
Table of Contents

Advertisement

2)
Attach the guide mylar lower (Packed items) to the position
indicated in the figure.
D. Install of the Connection fixture F/R
1)
Install the Connection fixture F (Packed items) to the main unit
with the fixing screws (Packed items).
2)
Install the Connection fixture R (Packed items) to the main unit
with the fixing screws (Packed items).
Paper exit port reference
+1mm
+0.5mm
Fixture reference
MX-5111N MX-PNX6A/B/C/D (PUNCH MODULE) 16 – 4
E. Check of the connected position of main unit
and finisher
1)
Engage the finisher that has installed punch unit to the main
unit, and temporarily fix.
* Insert the rail of the finisher unit into the rail reception fixture
of main unit, fix temporarily.
2)
Open the front door of punch unit.
3)
Check that the center of the screw hole of the punch unit is in
the range of specification of an oval hole of the mounting fix-
ture in front side of main unit.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx-5110nMx-4112nMx-5112nMx-4111nMx-5111n

Table of Contents