HP 3000 III Series Manual page 342

Table of Contents

Advertisement

HP 3242lA Series III Power Supplies
I
CAUTION
I
Do
not connect test equipment to power supply
chassis ground.
All common
circuits
within
the
power
supply
"float"
with
respect to
chassis ground.
Damage to test equipment
or
power
supply
components, and erroneous mea-
surements
may
result
if
this
caution
is
ignored.
9-13. Preventive Maintenance
The following preventive maintenance procedures are performed
at
monthly
or semi-monthly intervals.
The frequency
depends upon
the physical conditions prevailing at a particular site.
Routine
maintenance
once per month is
adequate for most
power supplies
that operate 24 hours per day, seven days per week.
The interval
can be
reduced in accordance
with the amount of time
the power
supply is turned off.
The power supply is not
removed from the
computer to perform preventive maintenance.
Perform the preven-
tive maintenance procedures as follows:
a.
Remove dust.
b.
Check PCA's for proper seating.
c.
Check cooling fan operation.
d.
Check the
dc operating
voltages at
the power
supply front
panel.
e.
Check the ac voltages for ripple at the PCA cage backplane.
To gain access to the power supplies,
open the rear door of
the
CPU cabinet bay.
The power supplies are hinge-mounted and may be
swung-out by removing the screws that attach the left side of the
front panel to the CPU cabinet bay.
In this position, the power
supply top
and bottom covers can be
removed for maintenance and
test.
If required,
use a vacuum cleaner to remove dust and other light
debris from the power supply.
Loosen encrusted dust with a soft-
bristled brush,
paying particular attention to
heat dissipating
areas.
With the top cover of the power supply removed, check all
PCA's for proper seating.
Adjust where necessary.
Set the power
switch to
ON
and check the
cooling fan
for proper
operation.
Ensure that no objects interfere with fan blade rotation.
Before making voltage checks,
the voltmeter must be allowed time
to warm
up as prescribed by the manufacturer
of the instrument.
Also,
the computer must run,
with any type
of program,
for at
least
15 minutes before making the voltage measurement.
Perform
9-8

Advertisement

Table of Contents
loading

Table of Contents