Download Print this page

Toshiba GR200 Series Instruction Manual page 684

Hide thumbs Also See for GR200 Series:

Advertisement

Device
Device #12
Operating signal #12
Device #2
Operating signal #2
Device #1
Operating signal #1
Contact-switch
Setting for the report (Dead band)
(iii)
For sending data for the network, the TOTALTIM function will get a new accumulated data
every cycle that is defined with the setting [TTIM*-SDB]. For example, if the user wishes to
report the operation time about the device #1, the user should set '1' to the setting [TTIM01-
SDB], provided the report cycle is required every one second.
Scheme switch
TTIM01-SDB
TTIM02-SDB
(omitted)
TTIM12-SDB
Data correction
(iv)
In the TOTALTIM function the user can correct the accumulation time using either IED front
panel operation or GR-TIEMS operation (For IED screen operation, see Chapter
For GR-TIEMS operation, see Chapter
IED
BI12
BI12-NC
Photo-
Filter
CPL
coupler
BI2
BI2-NC
Photo-
Filter
CPL
coupler
BI1
BI1-NC
Photo-
Filter
CPL
coupler
Binary IO module (BIO)
Figure 4.5-2 Acquisition of operation signals
Table 4.5-2 Setting for data revision
Set
1 to 720sec
1 to 720sec
(omitted)
1 to 720sec
Engineering tool
- 663 -
TOTAL12_PLC_SGNL
PLC
BI12-CPL
TOTAL02_PLC_SGNL
PLC
BI2-CPL
TOTAL01_PLC_SGNL
PLC
BI1-CPL
Comment
Data revision period for operating signal 1
Data revision period for operating signal 2
(omitted)
Data revision period for operating signal 12
)
6F2S1915 (0.46)
TOTALTIM
TT12
SAS
TT02
IED
IED
front
screen
screen
TT01
User interface
GRZ200 (Soft 031 & 032)
.

Advertisement

loading

This manual is also suitable for:

Grz200