Dump Acquisition; Post Execution; Tedoli Execution - NEC EXPRESS5800/140He Service Manual

Hide thumbs Also See for EXPRESS5800/140He:
Table of Contents

Advertisement

4.6

Dump Acquisition

The dump can be acquired by pressing the dump switch on the front of the Server. The destination
of the dump is the boot device. Note that the dump may not be acquired due to OS setting.
NOTE: If the dump switch is pressed once, it will be
masked until the DC power is turned off. Thus, always turn
off the DC power after dump acquisition.
4.7

POST Execution

The POST is executed at the power-on or reset operation. If an error occurs, the relevant error
message appears on the display. See Chapter 8 for the error messages.
4.8

TeDoLi Execution

Insert the attached EXPRESSBUILDER in the CD-ROM drive to start it and select the system
diagnosis from the menu to start TeDoLi. Then perform proper operations following the menus
appearing on the display.
NOTE: Always disconnect the LAN cable from the Server
before executing the system diagnosis because it may have
bad influences on the network.
-
-
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/140rd-4

Table of Contents