8. After pulling up the ejectors on the power cage, lift the power cage to remove it from the
Server.
9. To replace the power BP, remove the screws (7) to remove the power BP from the power
cage.
10. Install the power cage in the Server in the reverse procedure.
NOTE: The power BP has a jumper switch used to specify
whether the Server is mounted on the 140Rd-4 or 140He
chassis. Set the jumper switch on the new power BP after
the replacement to be the same as that on the power BP
before the replacement. The position of the jumper switch is
shown in the figure on the next page.