Honeywell GX-Series Installation And Setup Manual page 25

Gx series;
Table of Contents

Advertisement

GX-Series Control Panel Installation and Setup Guide
1. Release the hinged cap to expose the 10-way connector.
2. Plug the SPI Key on to the Program Header on the GX-Series control panel.
Removing the SPI Key
CAUTION: Always power down the panel BEFORE removing or connecting the SPI key. Failure to do so may
result in damage to the SPI key. Never "hot-plug" the SPI key.
1. Remove the SPI Key from the Program Header on the GX-Series control panel.
2. Secure the hinged cap to protect the 10-way connector.
2-17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gx-520Gx-48

Table of Contents