Honda FL5540K0 Operator's Manual page 23

Front loader for honda h5518a4 multi-purpose tractor
Table of Contents

Advertisement

Attach brace arms to masts with clevis
7.
pins and clip pin.
Tighten front guard bolts installed in step 5.
Torque: 76 ft-lb
(1 03
Nm).
Bring the two hoses along the left side
8.
brace arm to the left mast. Route hoses
on the left brace arm with metal loops.
Ensure that the high pressure hose
(smaller diameter) is positioned on top of
the suction hose (large diameter).
Install the nylon tie strap to bind the two
hoses together at front corner of hoodline.
Install valve handles to the hydraulic
9.
control valve mounted on the left mast.
The "A" handle attaches to the spool used
for loader operation and the
attaches to the spool for bucket operation.
"B"
handle
COTTER PIN
FRONT LOADER ASSEMBLY
PIN
21

Advertisement

Table of Contents
loading

Table of Contents