LOADER INSTALLATION
ATTACHING LOADER MASTS
Move the tractor until the masts are
4.
positioned in line with upright pads on the
sub-frame. Operate the bucket control
lever to roll the bucket down to push the
masts down onto the pads.
Use bucket movement to shake masts to
5.
align pin holes. Insert the fixing pins
through the masts and pads. Install clip
pins through holes.
Attach brace arms to mast and front guard
6.
as shown with clevis pins and clips.
Route hydraulic hoses along left brace
arm through hose holder loops.
Ensure high pressure hose (smaller of
two) is positioned on top of larger suction
hose.
38