Attach brace arms to masts with clevis
7.
pins and clip pin.
Tighten front guard bolts installed in step 5.
Torque: 76 ft-lb (103 Nm).
Bring the two hoses along the left side
8.
brace arm to the left mast. Route hoses
on the left brace arm with metal loops.
Ensure that the high pressure hose
(smaller diameter) is positioned on top of
the suction hose (large diameter).
Install the nylon tie strap to bind the two
hoses together at front corner of hoodline.
install valve handles to the hydraulic
9.
control valve mounted on the left mast.
The "A" handle attaches to the spool used
for loader operation and the
attaches to the spool for bucket operation.
CLEVIS PINS
handle
COTTER PIN
FRONT LOADER ASSEMBLY
LEFT BRACE ARM
COTTER PIN
PIN
C
HOOK
21