Fujitsu ETERNUS DX80 S2 User's Manual & Installation Instructions

Fujitsu ETERNUS DX80 S2 User's Manual & Installation Instructions

Disk storage system
Hide thumbs Also See for ETERNUS DX80 S2:
Table of Contents

Advertisement

P3AM-4832-07ENZ0
ETERNUS DX80 S2/DX90 S2
Disk storage system
User's Guide -Installation-

Advertisement

Table of Contents
loading

Summary of Contents for Fujitsu ETERNUS DX80 S2

  • Page 1 P3AM-4832-07ENZ0 ETERNUS DX80 S2/DX90 S2 Disk storage system User's Guide -Installation-...
  • Page 2 his page is intentionally left blank.
  • Page 3 Preface Fujitsu would like to thank you for purchasing our ETERNUS DX80 S2/DX90 S2 Disk storage system. The ETERNUS DX80 S2/DX90 S2 Disk storage system is designed to be connected to a Fujitsu (PRIMEQUEST or PRIMERGY) or other server. This manual describes all the procedures that are required to start operation of the ETERNUS DX80 S2/DX90 S2 Disk storage system (referred to as "ETERNUS DX Disk storage system"...
  • Page 4: About This Manual

    This chapter describes the components of the ETERNUS DX80 S2/DX90 S2 Disk storage system. ● Chapter 3 Rack Installation This chapter explains how to install the ETERNUS DX80 S2/DX90 S2 Disk storage system in a rack. ● Chapter 4 Connecting Cables This chapter explains how to connect various cables to the ETERNUS DX80 S2/DX90 S2 Disk storage system.
  • Page 5 The black "Must Do..." circle indicates actions that must be taken. The required action is both illustrated inside the black disk and written above it (e.g. Unplug). ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 6: Additional Information

    An "FC card", "LAN card", "Network Interface Card (NIC)", "Converged Network Adapter (CNA)", or "SAS card" may be used instead, depending on the server and interface. • Trademark symbols such as ™ and ® are omitted in this document. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 7 The label with the model, serial #, etc. is located here. Device ID label The label with the model, serial #, etc. is located here. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 8 Warning Labels and Manufacturer's Labels ■ Drive enclosures • Drive enclosure for DX80 S2/DX90 S2 (2.5inch) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 9 Warning Labels and Manufacturer's Labels • Drive enclosure for DX80 S2/DX90 S2 (3.5inch) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 10 Power distribution unit for DX80 S2/DX90 S2 (AC200-240V, 2U, Max 6 enclosures connection) Manufacturer's label The label with the model, serial #, etc. is located here. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 11 Power distribution unit for DX80 S2/DX90 S2 (AC200-240V, 2U, Max 8 enclosures connection) Manufacturer's label The label with the model, serial #, etc. is located here. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 12: Table Of Contents

    Installing Power Distribution Unit (1U) ......................48 3.1.2 Installing Power Distribution Unit (2U) ......................50 Installing Controller Enclosure ..................52 Installing Drive Enclosure ....................58 ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 13 Connection Setup for the ETERNUS DX Disk Storage System and Power Synchronized Units ......142 Server Connection Setup ....................142 System Status Check ....................... 143 Powering Off after Completion of the Setup Procedure ........... 145 ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 14 Power distribution unit for DX80 S2/DX90 S2 (AC200-240V, 2U, Max 8 enclosures connection) ....46 Figure 5.1 PC terminal connection for initial setup....................... 89 Figure 5.2 Overview of the AIS Connect function ......................133 Figure 5.3 Security features............................134 ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 15 Device installation order ..........................47 Table 5.1 ETERNUS DX Disk storage system operation according to the settings of the Auto Power function and the Power Resume function........................ 140 ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 16: Chapter 1 Preparation

    Table 1.1 Appropriate switch for each host interface type Host interface Switch to be prepared FC switch iSCSI LAN switch FCoE FCoE switch SAS switch ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 17: Connection To Lan For Operation Management

    When the Master CM is switched, the IP addresses ETERNUS DX Disk storage system of the previous Master CM’s are taken over by the new Master CM. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 18: Figure 1.2 Lan Control (When The Ip Address Of The Slave Cm Is Set)

    IP address of the Master CM. • Either or both an IPv4 address and an IPv6 address can be specified for the MNT port and the RMT port. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 19: Figure 1.3 Connection Example Without A Dedicated Remote Support Port

    This PC is used for maintenance operations. PC used for maintenance IP address A RMT ports are not used. CM#0 CM#1 Controller enclosure ETERNUS DX Disk storage system ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 20: Figure 1.4 Connection Example With A Dedicated Remote Support Port

    CM#1 Remote support center Controller enclosure ETERNUS DX Disk storage system Operation is performed with separate LANs for the MNT port and the RMT port. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 21: Figure 1.5 Connection Example When The Ip Address Of The Slave Cm Is Set

    RMT ports are not used. IP addresses for both the Master CM and Slave CM are set. CM#0 CM#1 Controller enclosure ETERNUS DX Disk storage system ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 22: Figure 1.6 Connection Example When The Ip Address Of The Slave Cm Is Set (And A Dedicated Remote Support Port Is Used)

    Operation is performed with separate LANs for the MNT port and the RMT port. The IP addresses of both the Master CM and Slave CM are set. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 23: Table 1.2 Lan Port Availability

    (*2) (*2) ping ICMP — — from — (*2) (*2) KMIP 5696 (*3) — (key (*2) (*2) management ) Yes: Available / No: Not available ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 24 When the STP function is necessary for the network configuration: Disable the STP function of the LAN switch port only for the ETERNUS DX Disk storage system connection or perform the Port-Fast setting. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 25: Setup Preparation

    IP address of MNT port IP address of FST Subnet Mask IP address of RMT port Label holder Pull out the plate while holding the tag. Plate ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 26 Check the settings of the Web browser. Refer to "ETERNUS Web GUI User’s Guide" for details on the settings that are required. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 27: Chapter 2 Components

    3.5" type Figure 2.2 Front view of a 3.5" type controller enclosure Operation panel 3.5" disk or 3.5" Solid State Drive (SSD) Flange cover Flange cover ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 28: Rear

    ■ Dual-controller type Figure 2.4 Rear view of a controller enclosure (dual-controller type) Controller (CM#0) Controller (CM#1) Power supply unit (PSU#0) Power supply unit (PSU#1) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 29: Components (Front)

    Figure 2.6 Operation panel (3.5" type controller enclosure) With a flange cover Without a flange cover POWER LED READY LED FAULT LED FUNCTION button MAINT/ID LED CACHE LED Power switch ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 30: Table 2.1 Status And Meanings Of Each Led (Operation Panel (Controller Enclosure))

    Maintenance or a status check via ETERNUS Web GUI or ETERNUS CLI is necessary. CACHE There is data in the ETERNUS DX Disk storage system cache memory. (green) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 31: Figure 2.8 Drive Slot Numbers (2.5" Type Controller Enclosure)

    Figure 2.10 Drive slot numbers (3.5" type controller enclosure) Slot#8 Slot#9 Slot#10 Slot#11 Slot#4 Slot#5 Slot#6 Slot#7 Slot#0 Slot#1 Slot#2 Slot#3 ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 32: Components (Rear)

    CA#1 FAULT LED UNIT ID LED MASTER LED LAN (MNT) port PWC port LINK/FAULT LED ACT LED LINK LED Host interface (CA#0) Host interface (CA#1) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 33: Table 2.3 Status And Meanings Of Each Led (Controller)

    The controller is sending or receiving data via the LAN port (for operation management). (green) LINK The link between the LAN port (for operation management) and the destination has been established. (green) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 34: Figure 2.12 Host Interface (Fc, Iscsi 10Gbit/S, Fcoe (For Fc Cable Connection))

    Host interface ports (FC, iSCSI 10Gbit/s, FCoE (for FC cable connection)) (from left to right: Port#0 and Port#1 in CA#0, Port#0 and Port#1 in CA#1) These are the Dual LC connectors to connect FC cables. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 35: Figure 2.13 Host Interface (Iscsi 10Gbit/S, Fcoe (For Copper Twinax Cable Connection))

    Host interface ports (iSCSI) (from left to right: Port#0 and Port#1 in CA#0, Port#0 and Port#1 in CA#1) These are the RJ-45 connectors to connect LAN cables. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 36: Figure 2.15 Host Interface (Sas)

    If a power outage is detected, data in the cache memory is saved to a non-volatile memory in the controller using the SCU. The saved data is retained in the non-volatile memory indefinitely. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 37: Figure 2.16 Power Supply Unit

    The power supply unit or the fan in the power supply unit is in error status. (off) (amber) (amber) (amber) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 38: Drive Enclosures

    Figure 2.18 Front view of a 3.5" type drive enclosure 3.5" disk or 3.5" Solid State Drive (SSD) DE-ID (drive enclosure number) display panel Flange cover Flange cover ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 39: Rear

    This section describes LEDs, a DE-ID (drive enclosure number) display panel, and drives of the front of the drive enclosure. ■ DE-ID (drive enclosure number) display panel The DE-ID (drive enclosure number) of the drive enclosure is displayed. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 40: Figure 2.21 Leds On The Front Side Of The Drive Enclosure

    The drive enclosure is in error status. (amber) POWER The drive enclosure is operating normally. (green) ■ Drives ● 2.5" drives Figure 2.22 2.5" drive DRIVE READY LED DRIVE FAULT LED ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 41: Figure 2.23 Drive Slot Numbers (2.5" Type Drive Enclosure)

    DRIVE FAULT • The drive is in error status. (amber) • In response to commands from ETERNUS CLI, the location of the drive is identified. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 42: Components (Rear)

    The link between the DI (OUT) port and the destination port has been established. (green) DI (IN) LINKUP The link between the DI (IN) port and the source port has been established. (green) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 43: Figure 2.27 Power Supply Unit

    The power supply unit or the fan in the power supply unit is in error status. (off) (amber) (amber) (amber) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 44: Power Distribution Units (For Regions Other Than Emea&I)

    This is a socket (IEC60320-C14) for incoming power supply. This socket is used to connect a power cord (AC input cable). • Main line switch This turns on and off the power distribution unit. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 45: Power Distribution Units (2U)

    This is a socket (IEC60320-C13) for outgoing power supply. This socket is used to connect a power cord (AC output cable). • Main line switch This turns on and off the power distribution unit. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 46: Figure 2.30 Power Distribution Unit For Dx80 S2/Dx90 S2 (Ac200-240V, 2U, Max 8 Enclosures Connection)

    This turns on and off the power distribution unit. • Outlet (OUTPUT) This is a socket (IEC60320-C13) for outgoing power supply. This socket is used to connect a power cord (AC output cable). ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 47: Chapter 3 Rack Installation

    Drive enclosures must also be installed in order of DE-ID (DE_No. label). Table 3.1 Device installation order Order Device Power distribution unit, Power synchronized unit Controller enclosure Drive enclosure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 48: Installing Power Distribution Unit (For Regions Other Than Emea&I)

    Attach the brackets and holders to the rack. Bracket A Screw holders M6 screws Holder Holder Bracket B (Rear rack pillars) Screw holders M6 screws ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 49 The blank panel should be attached at the same height as the power distribution unit. Blank panel (Front rack pillars) Power distribution unit (Rear rack pillars) End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 50: Installing Power Distribution Unit (2U)

    • Attachment procedure Clip the M5 cage nut tabs into the desired hole from the inside. Side view M5 cage nut Rack pillar (square) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 51 The blank panel should be attached at the same height as the power distribution unit. Blank panel Power distribution unit (Front rack pillars) (Rear rack pillars) End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 52: Installing Controller Enclosure

    The M5 centering screws should be inserted in the 1st and 6th holes above the base line of the controller enclosure. 2U rack rail M5 centering screws (10mm) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 53 (M5 cage nut) (M5 cage nut) 1st position 1st position (M5 pan head screw) (M5 pan head screw) Base line of controller enclosure Rack rails ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 54 Rack rail (for left side) (Rear rack pillars) Plate M5 screws M5 screws Washers Plate (Front rack pillars) M5 screws Rack rail (for right side) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 55 Failure to do so may cause injury. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 56 Use two M5 screws to fasten it in the rack. M5 screw M5 screw ■ For regions other than EMEA&I Use four M5 screws to fasten it in the rack. M5 screws M5 screws ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 57 Attachment location of the bracket Left Right 2.5" type 3.5" type 2.5" type 3.5" type controller enclosure controller enclosure controller enclosure controller enclosure Bracket Thumb screw End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 58: Installing Drive Enclosure

    The DE_No. labels are attached on the following locations. Right front side of the drive enclosure Upper rear side of the drive enclosure DE_No. label ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 59 M5 centering screw (10mm) M5 cage nut M5 pan head screw (10mm) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 60 (for left side). (Front rack pillars) Rack rail (for right side) "R" is stamped on the inner side of the rack rail (for right side). [Right] ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 61 (M5 screw) (M5 screw) Base line of drive enclosure Rack rails Tighten the M4 screws of the rack rails that were slightly unscrewed in Step (1). ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 62 Fasten the drive enclosure in the rack. ■ For the EMEA&I region Use two M5 screws to fasten it in the rack. M5 screw M5 screw ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 63 Use four M5 screws at the front of the drive enclosure to fasten it in the rack. M5 screws M5 screws Attach the flange cover that is provided with the ETERNUS DX Disk storage system. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 64 Attachment location of the bracket Left Right 2.5" type 3.5" type 3.5" type 2.5" type drive enclosure drive enclosure drive enclosure drive enclosure Bracket Thumb screw End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 65: Chapter 4 Connecting Cables

    When disconnecting LAN cables, depress the tab, then pull out the connector. This section describes dual-controller type as an example. Note that there is only Controller 0 (CM#0) for a single-controller type. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 66 Connect the other end of the LAN cable to the networking equipment, such as LAN switch or router. For networking equipment connection details, refer to the documentation for the networking equipment being connected to. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 67: Host Interface Connection

    When disconnecting the FC cable, pull out the connector while holding its tab. This section describes dual-controller type as an example. Note that there is only Controller 0 (CM#0) for a single-controller type. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 68 When connecting the FC cables, position them so that they will not obstruct replacement of the power supply unit or controllers by the maintenance engineer. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 69: Copper Twinax Cable Connection (For Iscsi 10Gbit/S And Fcoe)

    Procedure Connect the Copper Twinax cable to the ETERNUS DX Disk storage system. If the Copper Twinax cable connectors have covers, remove the covers. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 70: Lan Cable Connection (For Iscsi 1Gbit/S)

    ETERNUS DX Disk storage system and for operation management in order to maintain system performance. • The iSCSI interface operates in 1000Base-T full-duplex mode. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 71 Connect the LAN cable to the connection destination. Connect the connector at the other end of the LAN cable to the connection destination. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 72: Minisas Cable Connection (For Sas)

    Connect the miniSAS cable to the ETERNUS DX Disk storage system. Insert the miniSAS cable connectors in the host interface ports of Controller 0 (CM#0) and Controller 1 (CM#1). ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 73: Drive Enclosure Connection

    When connecting QSFP cables, check the connector orientation and then firmly push it all the way in. When disconnecting QSFP cables, use the pull-tab to extract the connector. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 74 The following figures show a QSFP cable connection between the controller enclosure and drive enclosure 1 and between drive enclosure 1 and drive enclosure 2. For a single-controller type Drive enclosure 2 Drive enclosure 1 Controller enclosure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 75 Carefully check the connection origin and connection destination. Attach the destination labels as shown below: Drive enclosure number IOM (I/O module) number Destination label CM (controller) number ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 76 0 (IOM6#0) in drive enclosure 1 with the QSFP cable. (1) Connect the plug to be connected to DI (OUT) port, to the DI (OUT) port of the Controller 0 (CM#0). Controller enclosure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 77 (2) Connect the plug to be connected to the DI (IN) port to the DI (IN) port of the I/O module 0 (IOM6#0) in drive enclosure 2. Drive enclosure 2 ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 78: Power Synchronized Unit Connection

    To help with power cord management and prevent incorrect connections, attach labels to the power cords and make a note of connection origins and destinations. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 79 Wrap the release tie around the power cord and fasten the release tie from either side. Make sure that the release tie is not loose. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 80 For the drive enclosure, the POWER LED on the power supply unit and the LINE LED on the front emit green lights and the fan revolves at high speed for 30 seconds. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 81: When 1U Power Distribution Unit Is Installed (For Regions Other Than Emea&I)

    PSU#0 inlets of the ETERNUS DX Disk storage system : Connect between the OUTPUT#1-n of the power distribution unit and the PSU#1 inlets of the ETERNUS DX Disk storage system ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 82 Turn the PSU switch of the power supply unit to the ON position (marked "|"). Make sure all of the PSU switches are in the ON position. Drive enclosure Controller enclosure Power supply unit (PSU#0) Power supply unit (PSU#1) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 83: When 2U Power Distribution Unit Is Installed (For Regions Other Than Emea&I)

    To help with power cord management and prevent incorrect connections, attach labels to the power cords and make a note of connection origins and destinations. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 84 Connect the PSU#0 power cord to power distribution unit#0 (the lower power distribution unit). Connect the PSU#1 power cord to power distribution unit#1 (the higher power distribution unit). ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 85: Figure 2.7 2.5" Drive

    PSU#0 inlets of the ETERNUS DX Disk storage : Connect between the OUTn of the power distribution unit #1 and the PSU#1 inlets of the ETERNUS DX Disk storage ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 86 PSU#1 inlets of the ETERNUS DX Disk storage Use the power cord clamps to prevent the power plugs from coming unplugged. Attach the power cord clamps removed in Step ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 87 Turn the PSU switch of the power supply unit to the ON position (marked "|"). Make sure all of the PSU switches are in the ON position. Drive enclosure Controller enclosure Power supply unit (PSU#0) Power supply unit (PSU#1) ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 88 For the drive enclosure, the POWER LED on the power supply unit and the LINE LED on the front emit green lights and the fan revolves at high speed for 30 seconds. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 89: Chapter 5 Setup

    When the LAN cable for the MNT port of Controller 0 (CM#0) is connected to a network device, connect the cable to a PC terminal. • Remove the LAN cable that is connected to the MNT port of Controller 1 (CM#1). ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 90: Powering On

    Press the Power switch of the controller enclosure. Drive enclosure Power switch Drive enclosure Controller enclosure The POWER LEDs on the controller enclosure and the drive enclosures are turned on. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 91: Eternus Web Gui Startup

    The login screen for ETERNUS Web GUI appears. To change the user interface language, click the [Option] button and select "English" or "Japanese" in "Language". ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 92: Initial Setup

    Set Date and Time • Change Password • Register Thin Provisioning License • Register Copy License • Register SED Authentication Key • Set Network Environment ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 93 The information that is set here is used for network management by SNMP. The name of the ETERNUS DX Disk storage system is displayed in the login and operation screens of ETERNUS Web GUI. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 94 To use the NTP function, set up the NTP function after the initial setup is complete. Specify the required items and click the [Next>>] button. A confirmation screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 95 Click the [OK] button. The Thin Provisioning Feature License is registered and the setting completion screen appears. Click the [Done] button. The [Register Copy License] screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 96 When SEDs are already installed in the ETERNUS DX Disk storage system, a message that requests rebooting appears. Reboot the ETERNUS DX Disk storage system. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 97 A confirmation screen appears. Click the [OK] button. The network setting is applied and the setting completion screen appears. Click the [Done] button. The [Logout] screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 98 LAN cables (for operation management) of the MNT ports on Controller 0 and Controller 1 to the network of the customer. Restart the Web browser and log in to ETERNUS Web GUI with the changed IP address. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 99: Raid Configuration Settings

    If a RAID group is configured with drives that have different speeds, the performance of the RAID group is reduced to the speed of the drive that has the lowest speed. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 100 "Create Mode". When "Automatic" is selected, the settings for "Automatic Setting" are displayed. When "Manual" is selected, the settings for "Manual Setting" are displayed. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 101 The RAID group is registered and the registration completion screen appears. Click the [Done] button. The screen display returns to the [RAID Groups] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 102 Click the [Volume] tab on the navigation of the ETERNUS Web GUI screen. The [Volumes] screen appears. In [Action], click [Create]. The [Create Volumes] screen appears. Select "Automatic" or "Manual" for "RAID Group / TPP Selection". ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 103 This is only available to one specified RAID group. For a RAID group that contains important data, assign "Dedicated Hot Spares", in order to preferentially improve the RAID group's access to hot spares. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 104 Click the [Component] tab on the navigation of the ETERNUS Web GUI screen. On the [Component] screen, click "Disks" in [Category]. The [Disks] screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 105 Select the drive that is to be registered as the Dedicated Hot Spare and click "Assign Dedicated Hot Spare" in [Action]. The [Assign Dedicated Hot Spare] screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 106: Host Affinity Settings

    Host affinity creation For details on the setting procedures, refer to "ETERNUS Web GUI User's Guide". Also refer to "User's Guide - Server Connection-" as required. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 107 The following screen shot shows registration of a host by clicking the [Now Connected] tab. A confirmation screen appears. Click the [OK] button. The FC/FCoE host group is added and the registration completion screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 108 The iSCSI host group is added and the registration completion screen appears. Click the [Done] button. The screen display returns to the [Host Group] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 109 The procedure to set the port parameters is as follows. The screens for setting port parameters vary depending on the host interface port that is being used. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 110 The port parameter is set and the setting completion screen appears. Click the [Done] button. The screen display returns to the [FC Port Group] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 111 The port parameter is set and the setting completion screen appears. Click the [Done] button. The screen display returns to the [iSCSI Port Group] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 112 The port parameter is set and the setting completion screen appears. Click the [Done] button. The screen display returns to the [FCoE Port Group] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 113 Only host interface ports with "CA" or "CA/RA" can be registered in a CA port group. For details about port mode settings, refer to "ETERNUS Web GUI User’s Guide". ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 114 The CA port group is created and the setting completion screen appears. Click the [Done] button. The screen display returns to the [CA Port Group] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 115 Enter the number for the first LUN and number of LUNs to allocate to the LUN group in [LUN Setting], select the number for the first volume to be allocated, and click the [OK] button. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 116 [Connectivity] screen, click "Create Host Affinity" in [Action]. The [Create Host Affinity] screen appears. Select the connection target from "Host Group - CA Port Group" in "Target Connection". ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 117 [Host - CA Port Connection], and click the [Create] button. A confirmation screen appears. Click the [OK] button. The host affinity is created and the registration completion screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 118: Eternus Dx Disk Storage System Monitoring Setup

    In [Category], click [Event/Dump]. The [Event/Dump] screen appears. In [Action], click [Setup Event Notification]. The [Setting based on Severity] tab screen of the [Setup Event Notification] screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 119 The event notification settings are applied. Check the setting completion message and click the [Done] button. The screen display returns to the [Event/Dump] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 120: E-Mail Setup

    Enter the destination e-mail address or addresses for the Destination E-Mail Address fields. Click the [Mail Server Settings] tab. The [Mail Server Settings] tab screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 121 The Retry Setting does not need to be changed from the default value for normal operation. Click the [Set] button to apply the specified settings. A confirmation screen appears. Click the [OK] button. The e-mail notification settings are applied. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 122: Syslog Setup

    • Logs are not sent again when a communication error occurs between the ETERNUS DX Disk storage system and the syslog server. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 123 The syslog notification settings are applied. Check the setting completion message and click the [Done] button. The screen display returns to the [Network] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 124: Snmp Trap Setup

    For details on the settings, refer to "ETERNUS Web GUI User's Guide". The following screen shot shows an example of the settings when the [IPv4 Settings] tab is selected. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 125 The [Setup SNMP Agent Manager] screen appears. In the manager list of the [Setup SNMP Agent Manager] screen, click the [Add] button. The [Manager] screen appears. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 126 Set up the community or the user that is used for SNMP Trap. To use SNMPv1 or SNMPv2c, perform the "Setup SNMP Agent Community" settings. To use SNMPv3, perform the "Setup SNMP Agent User" settings. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 127 The SNMP Agent community settings are applied. Check the setting completion message and click the [Done] button. The screen display returns to the [Network] screen. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 128 The SNMP Agent user settings are applied. Check the setting completion message and click the [Done] button. The screen display returns to the [Network] screen. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 129 The SNMP Agent Trap settings are applied. Check the setting completion message and click the [Done] button. The screen display returns to the [Network] screen. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 130 Register the file that was downloaded in Step 6 of "ETERNUS DX Disk storage system settings" as the MIB definition file for the monitoring software. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 131 The test transmission of the SNMP Trap is performed. Check the transmission completion message and click the [Done] button. The screen display returns to the [Network] screen. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 132: Remote Support Setup

    REMCS is not specified or is stopped. When REMCS is used, suspend the REMCS function, and then enable the AIS Connect function. Refer to "ETERNUS Web GUI User's Guide" for details. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 133: Figure 5.2 Overview Of The Ais Connect Function

    Sending ETERNUS DX Disk storage system logs to the AIS Connect server Remote access from the AIS Connect server to the ETERNUS DX Disk storage system ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 134: Figure 5.3 Security Features

    The following sections explain how to set the ETERNUS DX Disk storage system for remote support. For details on the settings, refer to "ETERNUS Web GUI User's Guide". ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 135 Select "Enable" for "AIS Connect" and then "Country code : Country name" for "Country of Installation(Country Code : Country Name)". Perform the other additional settings that are required. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED...
  • Page 136 If the AIS Connect function is being used, disable the AIS connect function and then start the remote support (by REMCS) setup. Procedure Start ETERNUS Web GUI. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 137 Disk storage system and the remote support center is checked. The connection check result is sent to the e-mail address that is set in "Result notification information". End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 138: Audit Log Setup

    Enabling of the audit log starts. Check the setting completion message and click the [Done] button. The screen display returns to the [Audit Log] screen. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 139 Setting of the audit log starts. Check the setting completion message and click the [Done] button. The screen display returns to the [Audit Log] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 140: Power Control Setup

    The ETERNUS DX Disk storage system is automatically turned on when AC power Power Resume function is enabled is supplied and when power is restored after a power failure. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 141 The Auto Power function and/or the Power Resume function setting is applied. Check the setting completion message and click the [Done] button. The screen display returns to the [System Settings] screen. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 142: Connection Setup For The Eternus Dx Disk Storage System And Power Synchronized Units

    For details on the server connection setup, refer to the following documents: • ETERNUS Web GUI User's Guide • ETERNUS CLI User's Guide • User's Guide -Server Connection- • Manuals of the drivers to be installed ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 143: System Status Check

    To display the [Storage] screen, click the [Component] tab on the navigation of the ETERNUS Web GUI screen. General status If there is a component in Warning or Error status, contact your sales representative or maintenance engineer. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 144 No. of this volume. After checking whether all of the preceding settings are correctly performed, setup of the ETERNUS DX Disk storage system is complete. ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 145: Powering Off After Completion Of The Setup Procedure

    The ETERNUS DX Disk storage system power is turned off. The POWER LED of the controller enclosure and the POWER LEDs of the drive enclosures are turned off. End of procedure ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation- Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0...
  • Page 146 However, Fujitsu shall assume no responsibility for any operational problems as the result of errors, omissions, or the use of information in this manual. • Fujitsu assumes no liability for damages to third party copyrights or other rights arising from the use of any information in this manual.

This manual is also suitable for:

Eternus dx90 s2

Table of Contents