Switch Installation
This chapter describes how to start your Cisco Metro Ethernet (ME) switch and how to interpret the
power-on self-test (POST) that ensures proper operation. It also describes how to install the switch and
how to make connections to the switch. Read the topics and perform the procedures in this order:

Preparing for Installation

This section covers these topics:
Warnings
These warnings are translated into several languages in the Regulatory Compliance and Safety
Information for the Cisco ME 3400 and Cisco ME 2400 Ethernet Access Switches document that ships
with the switch.
Before working on equipment that is connected to power lines, remove jewelry (including rings,
Warning
necklaces, and watches). Metal objects will heat up when connected to power and ground and can
cause serious burns or weld the metal object to the terminals. Statement 43
OL-7678-01
Preparing for Installation, page 2-1
Verifying Switch Operation, page 2-7
Installing the Switch, page 2-7
Installing and Removing SFP Modules, page 2-18
Inserting and Removing the SFP Module Patch Cable, page 2-21
Connecting to the 10/100 Ports, page 2-22
Connecting to SFP Modules, page 2-23
Where to Go Next, page 2-25
Warnings, page 2-1
Installation Guidelines, page 2-4
Verifying Package Contents, page 2-6
Verifying Switch Operation, page 2-7
C H A P T E R
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
2