Attaching The Rear Cable-Management Brackets And Cables (Optional); Step 4 - Cisco NPE-G2 - Network Processing Engine G2 Installation And Configuration Information

Installation guide
Hide thumbs Also See for NPE-G2 - Network Processing Engine G2:
Table of Contents

Advertisement

Chapter 7
NPE-G1 and NPE-G2 Installation and Configuration Information
Note

Step 4

If you removed power supplies from the router, replace the power supplies. (See the
Replacing an AC-Input or DC-Input Power Supply" section on page 10-14
supply in a Cisco 7200 VXR router.)
If you slid the front of the router out of the rack, slowly guide the router back into the rack.
Step 5
Use a 3/16-inch flat-blade screwdriver to tighten the screws that secure the router to the front mounting
Step 6
strips of the rack.
This completes the procedure for installing the NPE-G1 or NPE-G2 in a Cisco 7200 VXR router.

Attaching the Rear Cable-Management Brackets and Cables (Optional)

You may choose to use one of two types of cable-management brackets. One type is the same as is used
on the front of the router for managing port adapter and I/O controller cables. The NPE-G1- or
NPE-G2-specific bracket is used only on the NPE-G1 or NPE-G2, and provides more support for optical
fiber cables.
Depending on whether the router is front-mounted or rear-mounted in the rack, install the
cable-management brackets to the router. Go to one of these sections for instructions on rear-mounting
the cable-management brackets and attaching the cables:
Installing the NPE-G1 or NPE-G2 Cable-Management Brackets
If you are using the NPE-G1 or NPE-G2 and installing the cable-management bracket (Cisco Product
Number MAS-7200-CBLMGMT), use the following instructions.
bracket on the NPE-G1 or NPE-G2 on the Cisco 7200 VXR routers.
bracket on the Cisco uBR7200-NPE-G1 or Cisco uBR7200-NPE-G2 on the Cisco uBR7200 series
routers.
The captive installation screws on the NPE-G1 or NPE-G2 must be fastened to allow the
Note
cable-management bracket to provide proper cable support and strain relief. Always ensure that the
captive installation screws are properly tightened.
OL-4448-12
The NPE-G1 or NPE-G2 is not fully seated in the router midplane until you tighten its captive
installation screws.
Installing the NPE-G1 or NPE-G2 Cable-Management Brackets, page
to both the Cisco 7200 VXR routers and Cisco uBR7200 series routers.
Installing the Rear Cable-Management Brackets on a Front-Mounted Router (Optional),
page
7-31—This procedure applies to only the Cisco 7200 VXR routers.
Installing the Rear Cable-Management Brackets on a Rear-Mounted Router (Optional),
page
7-32—This procedure applies to only the Cisco 7200 VXR routers.
Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional),
page
7-34—This procedure applies to only the Cisco UBR 7246VXR universal broadband router.
Network Processing Engine and Network Services Engine Installation and Configuration
Installing the NPE-G1 or NPE-G2
"Removing and
when replacing a power
7-29—This procedure applies
Figure 7-17
illustrates installing the
Figure 7-18
illustrates installing the
7-29

Advertisement

Table of Contents
loading

This manual is also suitable for:

G1 - network processing engine g1Npe-g1

Table of Contents