3.
If the MB02R96 peak meter bridge is installed on the 02R96, remove it. First disconnect the
bridge cable from the METER connector on the 02R96. Then remove the 4 screws holding the
bridge in place (as shown below), and remove the bridge.
2 Screws
02R96
METER Connector
2 Screws
5
ME02R96