SET UP & USE
ASSEMBLY INSTRUCTIONS
1. Using the diagram below as reference to position the poles, INSERT E (LOWER
LEFT REAR VERTICAL POLE) and F (LOWER LEFT FRONT VERTICAL POLE) into
B LEFT BASE.
Use (1) M (SCREW) to secure on each side.
2. Insert D (UPPER LEFT REAR VERTICAL POLE) into E (LOWER LEFT FRONT
VERTICAL POLE).
Insert C (UPPER LEFT FRONT VERTICAL POLE) into F (LOWER LEFT FRONT
VERTICAL POLE), Line up I (CONNECTING RAIL) with the holes on the front and
rear poles as shown and secure using (1) M (SCREW) on each side.
Page 5